Pricing and availability / Atlanta

Atlanta colocation pricing and available capacity.

Planning ranges for cabinets, private cages and larger power blocks in a fast-growing market where immediate capacity can be much tighter than future supply suggests.

Page reviewed July 24, 2026

Atlanta pricing snapshot

Use these monthly bands to set a first-pass budget. They are not provider offers. Facility location, power delivery, density and network access can move a real quote outside the range.

Planning dataRefresh target: monthlyCurrency: USD
RequirementPlanning rangeBudget assumption
1 to 2U$125 to $240/moBasic power and internet allocation
Quarter or half cabinet$1,050 to $1,425/moShared cabinet environment
Standard full cabinet$1,425 to $1,800/moTypical 3 to 5 kW commit
10 to 20 kW high-density cabinet$2,375 to $4,950/moCooling method must be validated
Private cage$5,225 to $19,000/moFour-rack starting profile; density drives spread
250 kW$145 to $200/kW-moEnterprise wholesale planning band
500 kW$130 to $185/kW-moAssumes scale and multiyear term
1 MW$115 to $170/kW-moContiguous capacity and ramp required

Method: public 2026 cabinet and wholesale benchmarks combined with density and scale assumptions. Taxes, network, cross-connects and one-time costs are excluded. Replace these ranges with a normalized written quote before approval.

Current Atlanta availability snapshot

Market-wide vacancy does not tell you whether a specific facility can deliver your density, cooling and date. The sourcing profiles below are search parameters, not representations of current inventory.

OptionFootprintUsable powerCooling supportEstimated deliveryLast verified
Anonymized cabinet search1 to 4 cabinets5 to 80 kWAir or containment; liquid by reviewTarget 30 to 90 daysNot yet verified
Anonymized cage search4 to 20 cabinets20 to 250 kWDensity-specific engineering reviewTarget 60 to 150 daysNot yet verified
Anonymized suite search250 kW to 1 MWContracted usable kW to be definedAir, RDHx or liquid-ready by facilityTarget 4 to 20 monthsNot yet verified
A future phase is not treated as available until key utility, construction and service-ready dependencies are documented. See how we verify capacity and normalize pricing.

What the all-in Atlanta cost includes

Cabinet and usable power

Confirm the included cabinet or floor space and the usable IT load after redundancy and operating limits.

A/B and cooling

Dual feeds, containment, RDHx and liquid distribution can add design work, equipment and minimum commitments.

Network and remote hands

Model bandwidth, cross-connect recurring charges, cloud ports, installation labor and support minimums.

Install and escalators

Add cages, cabinets, cabling, deposits, turn-up fees, annual increases and power-related pass-throughs.

Nearby and strategic alternatives

Charlotte can work for a regional enterprise footprint, while Dallas offers another large southern market. Northern Virginia is stronger for dense interconnection, and Miami can fit Latin America-oriented network strategies.

Get a verified shortlist with capacity, normalized pricing and deployment timelines.

Define your initial kW, density, target date and network needs. A scout will compare options on usable capacity and total economics.

Capacity and pricing are verified for your requirement before they enter the shortlist. Read the verification policy.