Market guide / Houston

Houston is a working colocation market, not a land rush.

Thirty three of the forty four buildings we track here are already operational. In a year when every market page is about what is being built, Houston is the one where you can mostly buy what already exists.

Market profile

Why Houston reads differently from every other market on this site

Most of the markets we cover are supply stories. Land is bought, power is queued, and the interesting question is what lands in 2028. Houston is the opposite. Three quarters of its inventory is standing and running, the under-construction count is two, and the operators are the ones who serve enterprises rather than hyperscalers.

That is a function of demand rather than a failure of ambition. Houston's data center requirement comes from energy, engineering, petrochemicals, ports, healthcare and the medical center, and those buyers want cabinets, cages and a few megawatts near their own people. They are not the source of hundred megawatt pre-leases, so the market did not build for them.

The one number that frames a Houston search

Two buildings under construction. If a Houston operator tells you space is tight in a particular hall, the market cannot quietly absorb that anywhere else this year. Scarcity here is real rather than tactical, and it is worth checking rather than assuming.

What has been announced in Houston

Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below was read on the page it links to.

Announced, not filed3 projectsLargest: 1 GW
CapacityOperatorProjectWhat was announced
1 GWECLTerraSite-TX1600 acres east of Houston, off-grid and hydrogen powered, first 50 MW phase at about $450m. Announced capacity at full build-out
17 MWViVaVerse SolutionsViVa Center microgridOn the former HPE and Compaq campus, built to sell ancillary services back into ERCOT. Announced microgrid capacity, not IT load
10 MWElement CriticalHouston One expansionA 20,000 SF high density hall opening with 4.5 MW in Q4 2026
Read this before quoting any of it

Houston is the one market on this site where a multi-tenant expansion measured in single megawatts is the headline rather than a footnote. That is the market being honest about itself: it serves Gulf Coast energy, engineering and healthcare demand at enterprise scale, and the gigawatt project on the list is an off-grid AI campus that has nothing to do with the colocation floor.

Announced capacity is collected by hand from trade reporting and company statements, and each figure links to the report it came from. It is kept apart from the permit record above and never added to it: one is a document a jurisdiction issued, the other is a plan a company published. Neither is availability.

Seismic imaging is why the high density question came here early

Houston has run genuinely dense compute for longer than most markets, because the oil and gas industry has been doing large-scale seismic processing since long before anyone called it AI infrastructure. That history is useful to a buyer: the operators here have real experience with high draw racks, and the honest ones will tell you which halls can take them and which cannot.

It also sets a trap. A facility that handled dense HPC in 2015 is not automatically ready for what a modern GPU deployment does to cooling and power distribution. Ask about the specific hall, the specific cooling loop, and what was retrofitted rather than designed in.

Every Houston facility we track

44 data centers across Houston, from the facility database we hold as a Bridgepointe partner. It is the layer that says whether a building exists yet, which no permit record answers directly.

Our collection44 facilities24 operators
StatusFacilitiesWhat it means for a search
Operational33Standing and running. The only layer that can hold a requirement this year
Under construction2Steel is up. Reachable for a date 6 to 18 months out, and usually pre-leasing now
Planned9Announced or entitled, not yet built. Treat every date on these as a forecast
Building area on file9,324,381 SFAcross the 33 facilities where a size is recorded, of 44
Largest single building1,168,000 SFSwitch, Houston

Operators with the most facilities here: DataBank (5), Serverfarm (5), Data Journey (3), Digital Realty (3), LOGIX Fiber Networks (3), Element Critical (2), Equinix (2), GIGA Energy (2), Sungard Availability Services (2), Switch (2).

Where they cluster: Houston (27), Katy (4), Montgomery (3), Hockley (2), Spring (2), Brazoria (1).

The largest buildings coming to this market

11 facilities here are under construction or planned. These are the ten largest by floor area, and a size on file is not a promise of a delivery date.

OperatorStatusBuilding sizeWhere
ServerfarmPlanned565,000 SFHockley, TX
ServerfarmPlanned438,000 SFHouston, TX
TRG DatacentersUnder Construction110,000 SFSpring, TX
Cipher DigitalPlannedNot on fileSingleton, TX
CleanSparkPlannedNot on fileSealy, TX
Data JourneyPlannedNot on fileMontgomery, TX
EdgeCloudLinkPlannedNot on fileTBD, Houston
Element CriticalPlannedNot on fileKaty, TX
GIGA EnergyUnder ConstructionNot on fileBrazoria, TX
GIGA EnergyPlannedNot on fileWallis, TX

From the Signal facility database, which we hold as a Bridgepointe partner rather than as a public record, so these rows carry no filing link and street addresses are held back. A building existing is not the same as space being available in it: every facility above may be full, pre-leased, or closed to your size. Finding out is a call, not a lookup. See how we verify capacity.

What the public construction record shows in Houston

TCEQ air permits filed in Harris County and the surrounding Houston counties. Every figure below is a count of filings we collected ourselves, and every row links to the record it came from.

Our collectionLatest filing: 1 June 20232 filings tracked
MeasureFigureWhat it means
Filings we track2Deduplicated. One source, February 2023 to June 2023
Distinct addresses2Separate sites in the record, not separate buildings
Operators we can name12 of 2 filings name a recognizable operator. The rest name an engineer, a builder or a holding company

Operators appearing by name: DataBank (2).

The most recent filings on the record

FiledNamed on the filingWhat it saysType
1 June 2023DataBankDatabank Hou2Power and cooling
23 February 2023DataBankDatabank Hou3Power and cooling

Collected from TCEQ air permit search. A permit proves that construction is happening. It does not prove that space is available, and no public filing anywhere discloses what is contractible at a named building. That answer comes from an operator call, which is the part we do by hand. See how we verify capacity.

Weather is a real diligence item here, and it is answerable

Houston is a Gulf Coast market with hurricane exposure and a well documented flooding history, and pretending otherwise helps nobody. What matters commercially is that the question has specific answers, and that operators who have been through it can give them.

  • What is the elevation of the building relative to the 500 year floodplain, and has the map been revised since it was built?
  • How many days of fuel are held on site, and what is the refuelling contract during a regional event?
  • Where is the fuel stored, and is that location itself above the flood line?
  • What actually happened at this building during the last named storm and the last winter event?
  • Does the staffing plan assume people can reach the site, and what is the ride-out arrangement if they cannot?

The winter question matters as much as the hurricane one. Texas is on ERCOT, an isolated grid, and the 2021 winter emergency is inside the operating memory of every facility in this market. An operator who answers that question crisply is telling you something about the whole organization.

Where the market is, submarket by submarket

West Houston and the Energy Corridor

Where the enterprise colocation sits, close to the customers that drive it. Multi-tenant, carrier-served, and the realistic answer for most requirements under a megawatt.

Katy and the western suburbs

Newer, larger footprints on cheaper ground, and the direction most expansion has taken. Check the fiber before you check the price.

North Houston, Montgomery and Hockley

Where land-led development goes, including the very large off-grid projects. Long horizons, thin carrier choice, and not a colocation answer today.

Downtown and the medical center

The interconnection and latency-sensitive layer. Small, expensive per rack, and the right answer when proximity to the institution is the requirement.

When Houston is the right answer

Houston fits when your users, your equipment or your regulators are on the Gulf Coast, when the requirement is enterprise-sized rather than hyperscale, and when you want space that exists now rather than a phase in 2028. It is also a serious disaster recovery pair for Dallas-Fort Worth, on the same grid but four hours away, which is a different risk profile without a different vendor list.

It is the wrong answer when you need tens of megawatts, when you want deep cloud on-ramp choice, or when hurricane exposure is a board-level objection you cannot win. Dallas has more of everything except proximity to the Gulf Coast, and for most large requirements that trade is the right one.

Best buying posture

Quote Houston and Dallas together and make each operator answer the resilience questions above in writing. In a market with two buildings under construction, the leverage comes from being able to walk to another metro, not from playing two Houston operators against each other.

Houston search

Buy the building that is standing, at a price that reflects it.

A scout can test the Houston colocation layer against your power, density and date, get the flood and fuel answers in writing, and price it next to Dallas so the comparison is real.