Market reports / New York City

New York City data center permits, Q3 2026: no grid requests and no new capacity filed.

New data center buildings and capacity additions on file in the five boroughs in the third quarter of 2026, with New York City's place in the state grid queue. Each figure is linked to its public record.

New York City data center buildings and capacity permits and grid requests in the third quarter of 2026, five boroughs
Scope

Jurisdictions covered

  • New York City, New York, all five boroughs (New York, Kings, Queens, Bronx and Richmond counties). Partial: Department of Buildings filings that name a data center, filings at nine carrier hotel buildings, and the filings the city links to them.
  • Zone J of the state grid, which is New York City: data center requests in the grid operator's queue.
  • New York State: the executive order and utility regulator actions on data centers that apply in the city.
Findings

The quarter in brief

  1. No New York City data center is asking to connect to the state grid. At the end of the quarter the grid operator's queue held 0 MW of data center requests in Zone J, which is New York City. Statewide it held 11,143 MW.
  2. No new data center building or capacity addition was filed in the five boroughs. Every project in the record was filed in an earlier quarter.
  3. The one new data center building under way is small. Charter's one-story, 2,887 square foot hub in Red Hook received its HVAC permit on 12 August. Its building permit is still in review.
Provisional

These figures may change before the final edition. The counts cover filings that name a data center or sit in a known data center building, not every city permit. A filing is not space anyone can lease.

Map of New York City's five boroughs. No new data center building or capacity project was filed in Q3 2026. Charter's data center hub at 233 Conover Street in Red Hook, Brooklyn, filed earlier, received its HVAC permit on 12 August. Projects filed in 2025 and the first half of 2026 are shown in grey: new data rooms at 198 East 161st Street in the Bronx and 1 Centre Street, a data center expansion at 1470 Madison Avenue, data center racking at 2 MetroTech Center and a cage fit-out at 375 Pearl Street.
Every point on the map is a filing linked on this page. Download the map (PNG). Reporters may republish the map with credit to Colocation Scout and a link to this page.
Developments that matter

What changed this quarter

The grid queue has no data center request from New York City

The state grid operator, NYISO, queues large loads asking to connect to the transmission grid. Its queue at the end of September held 0 MW of data center requests in Zone J, New York City, in every status, including withdrawn ones. Statewide, data centers had requested 11,143 MW, all of it outside the city. A data center fed from Con Edison's local network would not enter this queue. So the zero means no city data center has reached the transmission process, not that none is planned.

The state also moved on large projects. On 14 July the Governor's Executive Order 62 paused state environmental permits for data centers of 50 MW or more until a statewide review is done. On 17 September the Public Service Commission adopted a draft scope for that review. No city filing states a size in megawatts, so the records cannot show whether the order reaches any city project.

The pause is now part of the governor's race. On 23 September City & State reported that Governor Hochul's reelection campaign is running ads on it through Election Day, calling it a one-year moratorium. The ad says her Republican opponent, Nassau County Executive Bruce Blakeman, called the moratorium "crazy" and backs new data centers. The order itself sets no end date, and as an executive order rather than a law it stays in the hands of whoever holds the office.

Charter's Red Hook hub is the only new data center building on file

Charter's building at 233 Conover Street, Brooklyn, is filed with the city as a "Proposed new building for Data Center Hub" (B01128862-I1). It is one story and 2,887 square feet. On 12 August the city permitted its $545,000 HVAC job (B01158069-I1). The new building permit was still in plan examination at the end of September. The city's record dates the building filing 30 March 2026, but a pile job from October 2024 already cites its number, so it may be older. The records do not say who the building will serve. At its size it is a network building, not a colocation campus.

Quarterly filings

Quarterly filing summary

New data center buildings and capacity additions in the covered record set, by the quarter first filed, with the quarter a permit was first issued for them. This is the observed record set, not a census of every city job. Each quarter comes from the same queries, so they compare.

QuarterProjects first filedOf which in a carrier hotel or colocation buildingProjects with a permit first issued
Q3 2026 (provisional)001
Q2 2026113
Q1 2026202
Q4 2025101
Q3 2025201
Q2 2025001
Q1 2025002

A project is one Department of Buildings job, together with any jobs the city files for the same new building. Only work that adds data center buildings or capacity is counted: new buildings, new data rooms and data hall fit-outs, and expansions of data center cooling or power. Replacements, repairs and renovations are not.

The six projects filed since January 2025 are three new data rooms or fit-outs in city offices and an office tower, one hospital expansion, a cage fit-out at 375 Pearl Street, and Charter's building. Counts this small are not a trend.

What to watch

  • Charter's new building permit at 233 Conover Street.
  • 20 October 2026: comments close on the draft scope of the state's data center review.
  • 3 November 2026: the election for governor, between a candidate running on the data center pause and one who opposes it.
  • Two bills. The Legislature passed a one-year moratorium on large data center permits on 4 June, unsigned. The Council's data center siting study, Int 0003-2026, has had no hearing.

For reporters. Media contact: Cody Swift, 844-506-2299. Every figure in this report links to its public record, and the method is on our methodology page.

Cite as: Colocation Scout, "New York City data center permits, Q3 2026," colocationscout.com/new-york-city-data-center-permits-q3-2026.html

Supporting evidence

Supporting evidence

Every project in the record, Q1 2025 to Q3 2026 (6 projects)
QuarterFirst filedWhereThe workTypeBuildingDeclared valueCity filings
Q3 202518 July 2025198 EAST 161 STREET, Bronx, NY 10451Installation of fan coil units on flrs 3 - 10. Installation of in-row cooling system and...New data room or data hall fit-outEnterprise, institutional or network site$7.0 millionX01154964-I1, X01154964-S1, X01154964-S3
Q3 202524 July 20251 CENTRE STREET, Manhattan, NY 10007Remove and install new chilled water lines from central mechanical room (chiller room) to...New data room or data hall fit-outEnterprise, institutional or network site$2.7 millionM01251230-I1
Q4 20251 October 20251470 MADISON AVENUE, Manhattan, NY 10029Mount Sinai - Hess Data Center Chilled Water Expansion Project Phase 2 - Mechanical modif...Expansion of data center cooling or powerEnterprise, institutional or network site$5.0 millionM01252416-I1, M01252416-S1, M01252416-S2
Q1 202623 January 20262 METROTECH CENTER, Brooklyn, NY 11201Installation of reinforcing steel to support additional weight of data center racking and...New data room or data hall fit-outEnterprise, institutional or network site$62,500B01343773-I1
Q1 202630 March 2026233 CONOVER STREET, Brooklyn, NY 11231proposed installation of a new emergency generator on the site, as per the plan. No chang...New buildingEnterprise, institutional or network site$545,000B01118738-I1, B01151577-I1, B01144563-I1, B01090364-I1, B01128862-I1, B01359497-I1, B01157037-I1, B01158069-I1
Q2 202623 June 2026375 PEARL STREET, Manhattan, NY 10038Modify Existing Data Center Layout With New Interior Metal Mesh Cage Partitions & Doors F...New data room or data hall fit-outCarrier hotel or colocation building$5,000M01415768-I1
Projects by type and kind of building

Carrier hotels are the nine buildings listed under method. Enterprise, institutional and network sites are everything else in the record.

Jobs first filed, by kind of building
QuarterCarrier hotel or colocation buildingEnterprise, institutional or network site
Q3 202600
Q2 202610
Q1 202602
Q4 202501
Q3 202502
Q2 202500
Q1 202500
Jobs first filed, by type of work
QuarterExpansion of data center cooling or powerNew buildingNew data room or data hall fit-out
Q3 2026000
Q2 2026001
Q1 2026011
Q4 2025100
Q3 2025002
Q2 2025000
Q1 2025000
Projects first filed in Q3 2026

No new data center building or capacity project was first filed in the covered record set this quarter. Work on Charter's Red Hook building, filed earlier, continued: its permits issued this quarter are listed below.

Permits first issued in Q3 2026
IssuedApplied forThe permitTypeDeclared value
12 August 202612 August 2026Install HVAC units in conjunction of NB B01128862.Scope not stated$545,000
17 September 202631 July 2026Propose to install plumbing fixtures and associate piping in conjunction with NB# B011288...Scope not stated$17,997
Data center requests in the state grid queue
Requested MW by end use, NYISO queue at the end of September 2026
End useZone J (New York City)New York State
Data center (general)05,876.9
AI data center05,266
Data centers011,142.9

From the end-use table on the "Load Project Tracking" sheet of the NYISO interconnection queue. It leaves out withdrawn and in-service requests, as the sheet does, and leaves out 745 MW of cryptocurrency mining. Zone J shows 0 MW in every status, including withdrawn. A data center fed from Con Edison's local network does not enter this queue.

State air permits in New York City

New York State's environmental permit applications for New York City (DEC Region 2, DART) include no data center air permit application received since January 2025. Four Region 2 air applications were received in that period, and none is for a data center. The last data center application on record there dates from 2012.

Government actions, January 2025 to September 2026
Projects reported but not confirmed in city filings (1)
  • Unverified project: DataVerge expansion at Industry City, 882 Third Avenue, Brooklyn. DataVerge said it has 1.5 MW available and 3 MW more coming online in Q2 2027, as reported by DCD on 9 June 2026 and datacenter.news on 21 May 2026. No city building or electrical filing at the building since January 2025 describes that work, so the 3 MW, its timing and its permits are unconfirmed.
Coverage, boundary and method

Boundary. The five counties of New York City, which are its five boroughs: New York County (Manhattan, FIPS 36061), Kings County (Brooklyn, 36047), Queens County (36081), Bronx County (36005) and Richmond County (Staten Island, 36085). The city government is the permitting authority in all five. Westchester, Long Island and New Jersey are outside the boundary and are covered by our tri-state edition.

Coverage by authority and record type, Q1 2025 to Q3 2026
AuthorityRecordsScopeStatus
Department of BuildingsJob filings and approved permitsFive boroughs, data center wording; nine carrier hotels; jobs filed for the same new buildingCounted. Partial: a job that never says data center, outside the nine buildings, is missed
Department of BuildingsElectrical permit filingsFive boroughs, data center wording; twelve data center buildingsReviewed. None states capacity over 1 MW
Department of BuildingsCertificates of occupancy; legacy filingsNoneNot collected
City Council; City Planning; Board of Standards and AppealsLegislation, land use, variancesFive boroughsReviewed. No data center action
State DEC, Region 2Air permit applicationsFive boroughsReviewed. None for a data center
NYISOLarge-load interconnection queueZone JReviewed. 0 MW

What is counted. Only permitting that adds data center buildings or capacity: new data center buildings, with the jobs the city files for them; new data rooms and data hall fit-outs; and expansions of data center cooling or power. A filing that names a data center counts without a stated capacity, including new power or cooling equipment. Power work that does not name a data center counts only when the record shows more than 1 MW serving one. Replacements, repairs, renovations of existing rooms, permit renewals and amendments are not counted, nor is work whose record does not say it serves a data center.

Carrier hotel buildings. 60 Hudson Street, 32 Avenue of the Americas, 111 Eighth Avenue, 85 Tenth Avenue, 375 Pearl Street, 25 Broadway and 325 Hudson Street in Manhattan; 882 Third Avenue in Brooklyn; and 7 Teleport Drive on Staten Island. These buildings also hold offices and shops, so a filing there counts only when it describes data center work.

Counting. A project is one Department of Buildings job, with its trade filings and amendments, plus any jobs the city files for the same new building. It is dated by its own first filing. A permit counts when the city first issued it, not when it renewed it. Declared values are the city's cost estimates and are never added together.

Certificates of occupancy are not part of this report's New York City record set, so none are listed. That is not a finding that none were issued.

Sources and revisions

Every figure links to the public record it came from: the city's job filing or approved permit, the state's notice or order, or the grid operator's queue. Counts are generated from those records. When this edition is final its figures are frozen: a later correction is added below with its date and reason, and the original figure stays visible.

Colocation Scout is run by a colocation sourcing consultant; the permit data is public and every row links to its filing. How we publish these reports.

Revisions: none yet. Edition status: provisional.

Research author

Cody Swift
Head of Data Center Brokerage and Research at Colocation Scout
Powered by Bridgepointe Technologies
844-506-2299

Research at Colocation Scout

Colocation Scout tracks data center construction across U.S. markets from public records: building permits, planning cases and state air permits. Every figure in a report links to the filing it came from, so any reader can check it. How we publish these reports.

About Bridgepointe Technologies

Bridgepointe Technologies has been a technology advisory firm since 2002. It helps companies choose data center, connectivity and cloud providers, and partners with more than 380 of them. Buyers pay nothing: providers fund the advisory, and we say so.

Market intelligence

Ask what the record means for your requirement.

The filings show where data center work in New York City is on file. A scout finds out which of it is reachable at your size, on your date, at a price worth signing.