Market guide / Alabama

Alabama colocation is built around one regional operator. The hyperscale campuses here are not for lease.

Six buildings across Huntsville, Birmingham, Auburn and Montgomery carry a public interconnection listing, with thirty one network presences between five operators. One of them, DC BLOX at 333 Diamond Drive in Huntsville, is named independently by the city's own permit register, by the federal air register and by PeeringDB, with $18.7 million of permitted alteration work issued there in April 2026.

Alabama colocation market

How much does colocation cost in Alabama?

Recent quotes we received for Southeast ran $180 to $220 per kW per month for up to 500 kW, falling to $140 to $160 above 1 MW.

Alabama colocation pricing, USD per kW per month. Our quotes are for Southeast, updated October 26, 2026.
DeploymentMonthly rateSource
Up to 500 kW$180 to $220/kW-moOur quotes
Over 500 kW to 1 MW$160 to $190/kW-moOur quotes
Over 1 MW$140 to $160/kW-moOur quotes

We have no published Alabama asking-rent band to cite, so the Southeast Region quotes are the figure to plan with.

Smaller deployments cost more per kW. These are recent quotes we received, not a statement that space is available. Cross-connects, remote hands and one-time setup are extra. Operators often give 2–3 free months on a new term. See every region's quote ranges.

Alabama cabinet and cage prices

Smaller deployments are priced per cabinet or per cage rather than per kW. Use these monthly ranges to set a first-pass budget. They are not provider offers, and a building on this page is not a claim that space is available in it.

RequirementMonthly rangePower and bandwidth assumed
1 to 2U$130 to $240/mo1 to 3 A at 120 V, 1 to 5 TB of transfer
Half cabinet, 24U$1,040 to $1,440/mo2 to 3 kW, 100 Mbps to 1 Gbps
Full cabinet, 48U$1,450 to $1,675/mo2 to 5 kW, 100 Mbps to 1 Gbps
High-density cabinet, 48U$2,240 to $4,625/mo10 to 17 kW, three-phase
Private cage, 4 racks$4,875 to $5,320/mo5 kW per rack, 1 Gbps
High-density private cage, 4 racks$15,470 to $19,615/mo20 kW per rack, 1 Gbps

Based on quotes we received in the 30 days before 24 October 2026. Taxes, cross-connects, remote hands and one-time costs are extra. Replace these ranges with a normalized written quote before approval. How power is billed is covered in how colocation power is billed.

Get Alabama colocation prices for your setup

Tell us the racks, power and timing you need. A scout comes back with matching Alabama options and quoted prices.

Sample comparison of six colocation options side by side: monthly cost, committed power, dollars per kW, setup, term and deployment timing.
What you get back: every quote on one sheet, priced per kW so the options compare. This is a sample.
Add your name, company or phone Optional

Free to you. Powered by Bridgepointe Technologies, trusted by NVIDIA, Microsoft, Charles Schwab and 75+ Fortune 500 companies. A scout replies within one business day.

Who is actually plugged in across Alabama

A building existing and a building being connected are different facts, and only one of them decides whether your traffic can get where it needs to go cheaply. These figures come from PeeringDB, which the network operators themselves maintain, so every row below links to the building's own public entry.

Public record6 buildings listed31 network presences
MeasureFigureWhat it means
Buildings listed6Registered in PeeringDB across Alabama, by 5 operators
Buildings with a network present6Every listed building has at least one network in it
Network presences31Counted per building, so a carrier in three buildings counts three times
Internet exchange presences3Where you can reach many networks through one port instead of many cross-connects
Carrier presences5The physical transport choice you can buy without leaving the building
In the densest building39%AUBix Auburn holds 12 of the market's network presences

The most connected buildings here

NetworksBuildingOperatorExchangesCarriers
12AUBix AuburnAUBix LLC11
11RSA Dexter Avenue DatacenterRetirement Systems of Alabama (RSA)11
4DC BLOX BHM1 - DCBLOX BirminghamDC BLOX Parent LLC11
2DC BLOX HSV1 - DCBLOX HuntsvilleDC BLOX Parent LLC01
1Peace Communications HSV1Peace Communications00
1Simple HelixSimpleHelix01

From PeeringDB, which is maintained by the network operators present in these buildings rather than by the landlords, which is what makes it worth more than a directory. Two limits. Entries are voluntary, so a building showing no networks may be single tenant or may simply never have registered. And a network being present says nothing about whether the building has space, power or a price for you: that is still a call.

Market profile

Why Alabama is a market

Alabama is a federal and defence market before it is anything else. Huntsville holds the Army's missile and aviation command, NASA's Marshall Space Flight Center, the FBI's growing Redstone campus and the contractor base that follows all three. That is a customer base with real compliance requirements, real latency requirements to local people, and a longstanding shortage of commercial colocation to put it in.

This page is written for the state rather than for Huntsville alone, and the data forced that choice. The two best connected buildings in Alabama are in Auburn and Montgomery, not Huntsville. The one colocation operator with announced growth here, DC BLOX, runs buildings in Huntsville and Birmingham and has announced a site in Montgomery. A page called North Alabama would have had to leave out most of its own evidence.

The second argument is power. Alabama sits in the TVA and Alabama Power territories, with industrial rates below the national average and a large nuclear and hydro base. It is not free of weather risk. Hurricanes weaken well inland, but Alabama sits in the Southeast tornado belt that NOAA studies for exactly that reason. Ask how any building is hardened.

Hyperscalers are here, but you cannot buy space from them. Meta runs a Huntsville campus and is building a second in Montgomery, now put at more than $1.5 billion. Google has run a campus at Bridgeport since 2019 and announced a $1.5 billion expansion there in June 2026. None of that is colocation. Read the announced section before you plan around scale here.

One building, three independent records

The single most useful fact on this page is a cross-confirmation. DC BLOX operates a building at 333 Diamond Drive NW in Huntsville. The City of Huntsville's own air permit register carries it. PeeringDB lists DC BLOX HSV1 at the same street number, maintained by the networks inside it rather than by the landlord. And the city's building permit record against that address shows an alteration commercial permit for $18,713,820 issued on 30 April 2026, alongside earlier permits of $24,037,700 in October 2024 and $5,325,000 in September 2022.

Roughly $48 million of permitted work at one address over four years, the most recent tranche within the last twelve months, on a building networks are demonstrably plugged into, run by an operator who has separately announced a second Huntsville site. That is as close as this site gets to proving a market is being invested in, and it is worth more than a large count of undated rows somewhere else.

Two limits belong with it. A permit proves construction spending, not available space, and nothing in the public record says what is contractible in that building today. And the dates above come from the city's building permit layer, not from the air registers that put this building in the count below. Those registers publish no dates, which is why the count reads as undated.

Air permits at Huntsville, Bridgeport and Montgomery, including the DC BLOX building the City of Huntsville's own register also carries. Every figure below is a count of filings we collected ourselves, and every row links to the record it came from.

Our collectionNo filing dates published. Latest permit issued: 30 April 20264 filings tracked
MeasureFigureWhat it means
Filings we track4Deduplicated. Across 2 sources, none of which publishes filing dates
New building filings1Shell and site work, which is capacity two years out, not now
Distinct addresses4Separate sites in the record, not separate buildings
Operators we can name11 of 4 filings name a recognizable operator. The rest name an engineer, a builder or a holding company
Filings with no date published4The source publishes the facility, not the filing date

Operators appearing by name: DC BLOX (1).

The filings on the record

FiledNamed on the filingWhat it saysType
No date publishedNot an identifiable operatorStarbelt, LlcPower and cooling
No date publishedNot an identifiable operatorWiessner Enterprises, LlcPower and cooling
No date publishedDC BLOXDC Blox, LLCNew building
No date publishedNot an identifiable operatorDotier, LlcPower and cooling

Collected from EPA ECHO air facility records for Alabama and Huntsville air permit records. A permit or air-register entry documents a site or proposed work. It does not establish current construction or available space, and no public filing anywhere discloses what is contractible at a named building. That answer comes from an operator call, which is the part we do by hand. See how we verify capacity.

What has been announced in Alabama

Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below links to a published report that states it, and was checked against at least one other independent report before it was written down.

Announced, not filed2 projectsLargest: 5 MW
CapacityOperatorProjectWhat was announced
5 MWDC BLOXMontgomery, Interstate Industrial Park at Hope HullAnnounced on 14 November 2024 as one of four southeastern hyperscale edge node sites, alongside Huntsville, North Augusta in South Carolina and the Atlanta East campus at Conyers, Georgia. Reported at roughly $30 million, on Interstate Industrial Park off the Hope Hull exit of I-65, with construction stated to begin in June 2025. The row carries 5 MW because that is the capacity described as delivered initially for the anchor tenant; the 40 MW is what the site is said to be able to reach if further tenants arrive. Treat the gap between those two numbers as the question to ask on a call rather than as supply. Initial capacity for a hyperscale anchor tenant. The developer states the site can scale to 40 MW for further tenants, which is a design ceiling rather than a commitment
5 MWDC BLOXHuntsville, a second site alongside the existing HSV1Announced in the same 14 November 2024 release as the Montgomery site. This is the project that ties the three layers on this page together: DC BLOX already operates HSV1 at 333 Diamond Dr NW, which is the building the City of Huntsville's own air register carries and which PeeringDB lists at the same street number, and the city's building permits record $18,713,820 of alteration work issued there on 30 April 2026. An operator expanding in a market it already serves, with the permit record and the interconnection register independently naming the same address, is the strongest evidence of commitment anywhere in this state. Capacity the site is designed to provide, as stated in the announcement
Read this before quoting any of it

Both rows are the same operator, and that is the most important thing about announced capacity in Alabama. DC BLOX is a regional provider rather than a hyperscaler, the figures are 5 MW rather than hundreds, and they are edge node sites built to serve the Southeast rather than campuses built to chase national AI demand. For most readers of this page that is the right size: the requirement people bring us here is a few cabinets to a few hundred kilowatts near people, not a hall. Alabama does have hyperscale building, but none of it carries a published megawatt figure, so none of it has a row. Meta operates a campus in Huntsville and is building one in Montgomery, each reported at more than $1.5 billion, and Google operates at Bridgeport in Jackson County, where it announced a $1.5 billion expansion in June 2026. All three are companies building for themselves. None is colocation, and none is space a tenant can lease. Read the reporting.

Announced capacity is collected by hand from trade reporting and company statements, and each figure links to the report it came from. It is kept apart from the permit record above and never added to it: one is a document a jurisdiction issued, the other is a plan a company published. Neither is availability.

The question that separates a real answer from a good one

Ask what is available in the specific building rather than in the operator's footprint. This market is concentrated enough that an operator can truthfully describe a strong Southeast presence while the room in front of you is nearly full. Then ask what the expansion path is on that campus and whether it is funded, because the one operator here with announced growth has announced it at 5 MW increments, not at hall scale. And ask about connectivity honestly: two of the six listed buildings carry a single network each.

Where the market actually is

Huntsville

Where the demand is and where the investment record is. Three listed buildings, DC BLOX HSV1 alongside Peace Communications and Simple Helix, plus the permitted Starbelt site on South Profile Place. Thin on network count, strong on everything else. If your requirement is driven by people or by federal work, it starts and probably ends here.

Auburn

The most connected building in the state, and a genuine surprise. AUBix carries twelve networks and an exchange presence in a university town of about 76,000 at the 2020 census. Worth scoping if interconnection matters more to you than proximity to Huntsville, and worth knowing about simply because almost nobody does.

Montgomery

Two things at once. The Retirement Systems of Alabama building on Dexter Avenue carries eleven networks and an exchange presence today, and DC BLOX has announced a new site at Hope Hull off I-65. It is the one place in the state with both an established interconnection anchor and announced new capacity. A federal air permit filed under the name Dotier LLC at 1053 Hyundai Boulevard joined the count here in September 2026. Dotier is reported to be a Meta subsidiary, by Inside Climate News and NBC 15. The state's engineering analysis names the site the Montgomery Data Center. That is Meta's campus across I-65 from the Hyundai plant. It is single tenant and sells no colocation.

Birmingham and the TVA corridor

Birmingham holds DC BLOX BHM1, four networks and an exchange presence, the operator's other Alabama building. North of it, the permitted site at Bridgeport sits in the TVA Widows Creek corridor. Google has run a data center on the retired Widows Creek coal plant site since 2019 and is expanding it. The air permit there is filed under a company name that is not Google's, and we have not confirmed from a primary source that it is Google's building.

When Alabama is right, and when it is the wrong choice

It is right when you need to be near Huntsville's federal and defence base, when your requirement is a few cabinets to a few hundred kilowatts, or when you want a Southeast second site that is not Atlanta. Power is cheap, the operator is regional and will actually return your call for a requirement this size, and the market is uncrowded in a way that tends to show up in pricing.

It is the wrong choice if you need scale. Meta and Google build here, but for themselves. The announced colocation figures are 5 MW, and the largest listed building carries twelve networks. A requirement measured in tens of megawatts should be tested against Atlanta first. It is about 150 miles from Birmingham, roughly two and a half hours by road, and is one of the largest markets in the country.

It is also the wrong choice if you need many networks in one room. Thirty one presences across the whole state, spread over four cities, is a working ecosystem for enterprise workloads and is not an interconnection market. If cross connects are the point, go to Atlanta.

How to actually negotiate in Alabama

Ask whether the building is in TVA or Alabama Power territory and what that means for your rate and for any demand charges. Ask for committed and energized capacity separately from design capacity, and ask specifically what is available in the room rather than on the campus. Because the market leans on one operator, ask what happens to your pricing at renewal if you have no realistic alternative in the city, and get the renewal terms in the first contract rather than the second. If you are looking at Huntsville, ask directly about the second announced site, when it energizes and whether your growth would sit there or where you are now.

Pricing context. We found no posted list price in Alabama that we would stand behind. A number here comes from a quote. For the nearest market with a pricing guide, see Atlanta colocation pricing. The cost estimator gives an illustrative range based on Ashburn. Use it as a reference point, not a local price.

Alabama search

Find out what is actually available in Alabama.

A scout can test this state against your power, density and date, tell you which buildings can really take it, and price it beside Atlanta and Nashville so the comparison is honest.

From the research desk

Latest market developments

All news & analysis
Development & Power

DOE selects 31 grid projects for $1.9 billion and says they will add 23 GW of transmission capacity

The U.S. Department of Energy announced on September 24, 2026 that it intends to help fund 31 grid projects across 26 states under its SPARK program. DOE says the projects total $5.25 billion, with $1.9 billion in federal funds and $3.35 billion in recipient cost share, and will make over 23 GW of additional capacity available on the grid. These are selections. DOE's list says project details are subject to change pending final financial assistance agreements. [Source 1] [Source 2]

United States (projects in 26 states and Guam) · Announced (DOE selections dated September 24, 2026; awards expected October 2026 to January 2027)
Read the analysis