Capacity / Available now and coming

Available Data Center Capacity by Market and Date

Space and power operators have told us they can deliver, listed by region, size and date. Every row shows the day we last confirmed it. The building is named on a call.

58.7 MW
listed across 20 sites in 16 markets
7.8 MW
available now, the rest dated by quarter
Oct 22
most recent confirmation with an operator

As of October 22, 2026, operators have told us they can deliver 58.7 MW of data center capacity across 20 sites in 16 markets. 7.8 MW of it is available now. Each row shows the day we last confirmed it.

Every listing

Sorted by available date, then size. Use the column headings to sort by location, capacity or date.

Last confirmed
Denver, CO2 MWAvailable nowAsk about AC-007
Cincinnati, OH1.8 MWAvailable nowAsk about AC-008
Philadelphia, PA1.5 MWAvailable nowAsk about AC-009
Chicago, IL500 kWAvailable nowAsk about AC-005
Atlanta, GA500 kWAvailable nowAsk about AC-010
Minneapolis-Saint Paul, MN500 kWAvailable nowAsk about AC-011
Nashville, TN400 kWAvailable nowAsk about AC-012
Dallas-Fort Worth, TX205 kWAvailable nowAsk about AC-003
Northern Virginia, VA140 kWAvailable nowAsk about AC-002
Austin, TX110 kWAvailable nowAsk about AC-004
New York metro, NY100 kWAvailable nowAsk about AC-020
Houston, TX50 kWAvailable nowAsk about AC-006
Dallas-Fort Worth, TX250 kWQ1 2027Ask about AC-001
Austin, TX150 kWQ1 2027Ask about AC-014
North Carolina120 kWQ1 2027Ask about AC-018
Florida100 kWQ1 2027Ask about AC-013
Houston, TX100 kWQ1 2027Ask about AC-015
Philadelphia, PA100 kWQ1 2027Ask about AC-017
Phoenix, AZ50 kWQ1 2027Ask about AC-016
Mountain Region50 MWQ3 2027Ask about AC-019

Available capacity by region

  • Mountain Region: 50 MW across 1 site. None available today.
  • Colorado: 2 MW across 1 site. Denver. 2 MW available now.
  • Ohio: 1.8 MW across 1 site. Cincinnati. 1.8 MW available now.
  • Pennsylvania: 1.6 MW across 2 sites. Philadelphia. 1.5 MW available now.
  • Texas: 865 kW across 6 sites. Dallas-Fort Worth, Austin, Houston. 365 kW available now.
  • Georgia: 500 kW across 1 site. Atlanta. 500 kW available now.
  • Illinois: 500 kW across 1 site. Chicago. 500 kW available now.
  • Minnesota: 500 kW across 1 site. Minneapolis-Saint Paul. 500 kW available now.
  • Tennessee: 400 kW across 1 site. Nashville. 400 kW available now.
  • Virginia: 140 kW across 1 site. Northern Virginia. 140 kW available now.
  • North Carolina: 120 kW across 1 site. None available today.
  • Florida: 100 kW across 1 site. None available today.
  • New York: 100 kW across 1 site. New York metro. 100 kW available now.
  • Arizona: 50 kW across 1 site. Phoenix. None available today.

Available capacity by timeframe

WhenCapacitySitesWhere
Available now7.8 MW12Denver, CO; Cincinnati, OH; Philadelphia, PA; Chicago, IL; Atlanta, GA; Minneapolis-Saint Paul, MN; Nashville, TN; Dallas-Fort Worth, TX; Northern Virginia, VA; Austin, TX; New York metro, NY; Houston, TX
Q1 2027870 kW7Dallas-Fort Worth, TX; Austin, TX; North Carolina; Florida; Houston, TX; Philadelphia, PA; Phoenix, AZ
Q3 202750 MW1Mountain Region

What this list is, and what it is not

Each row is capacity an operator has told us it can deliver to a new customer. The figure is critical IT load unless the row says otherwise. Utility power to the site is usually larger and is not what you lease.

A listing is not a reservation. Space in this market is often committed within weeks, and another buyer can sign first. We confirm a row again against your requirement before you rely on it.

The location stops at the metro. Where a city would give the building away, we show the state or region instead. Operators share these sites with us before they market them, and the name is what we discuss with you on a call.

How to read the dates

  • Available now means the operator says the space and power can be delivered on a standard install schedule.
  • A quarter or a month is the operator's own delivery estimate. Construction and utility work can move it.
  • Last confirmed is the day the operator last confirmed the row with us. A row we cannot reconfirm within 45 days comes off the list.

Why a list like this matters right now

Vacancy across the major North American markets is near record lows, according to CBRE, and most capacity under construction is leased before it is finished. Large contiguous blocks are the hardest to find. When a block opens, the buyer with a defined requirement and a signed-off budget usually takes it. The construction pipeline shows what is being built. This list shows what operators say they can sell.

What to send us

Four things get a useful answer fastest: the load in kW or MW, the density per rack, the markets you would accept, and the date you need power. If one of the sites above fits, name its listing number. If none fits, send the requirement anyway. Most of what operators are holding is never listed anywhere.

How we check a site is set out in how we verify capacity.

Looking for more than 500 kW? Our wholesale site, Data Center Scouts, lists the larger blocks for wholesale and hyperscale tenants.

Ask about a listed site, or send a requirement.

A scout confirms the site against your load and date, then names the building and the terms on a call.

Add your name, company or phone Optional

Free to you. Powered by Bridgepointe Technologies, trusted by NVIDIA, Microsoft, Charles Schwab and 75+ Fortune 500 companies. A scout replies within one business day.