Why shell LLCs matter when you are sourcing capacity
Developers and cloud platforms form single-purpose LLCs for land assembly, financing ring-fencing, and local non-disclosure agreements. For an enterprise buyer or site-selection team reading local news, one distinction matters above everything else: whether a mystery filing is a closed hyperscaler self-build or a multi-tenant developer project.
- Keyword searches for company names miss the pipeline. Searching municipal or EPA databases for "Meta" or "Google" misses filings under Anviran, LLC (Georgia), DEGAS LLC (Wisconsin), Winner LLC (Texas), Peanut LLC (Virginia), and Project Zodiac (Indiana).
- Hyperscaler shells mean zero leasable space. When a 200 MW campus behind an anonymous LLC belongs to Amazon, Google, or Meta, it absorbs local substation capacity and raises regional utility queues without adding a single kW of enterprise colocation.
- Undisclosed stays undisclosed. Where public records do not name a parent company or tenant, we mark the row undisclosed rather than repeating local rumor.
Verified hyperscaler and enterprise shells and codenames
Each entity or project codename below is tied to its parent company directly through an SEC filing, municipal staff report, air-permit record, or confirmed company disclosure. These are single-tenant or self-build campuses, not multi-tenant colocation space.
| State & location | Filing LLC or codename | Verified parent | Scope and primary record |
|---|---|---|---|
| Colorado Aurora | Haras Developments LLC (APA-50) | Amazon (AWS) | AWS DEN-22 air permit 19AR0178 at 19650 Winter Park Ave (CO APCD; Aurora guide). |
| Colorado Aurora | Project Sycamore & Project Pearl | JPMorgan / Kroger | 23505 E 6th Ave (270,000 sq ft JPMorgan single-tenant) and 6125 N Jackson Gap St (Kroger); see Aurora guide. |
| Georgia Sandersville | Anviran, LLC | Meta | Wholly owned Meta subsidiary leasing 175 MW ($6.6B, 20-year term) from CleanSpark (SEC filing). |
| Indiana Fort Wayne | Project Zodiac | Five-building campus (DC01 to DC05) on Zodiac Way (Fort Wayne Accela). | |
| Missouri Kansas City | Project Mica | Five-building Northland campus on ~500 acres; confirmed Feb 2026 (KSHB report; KC guide). | |
| Nebraska Southeast NE | Project Tenaska | Google + Tenaska | Proposed ~1 GW campus; Tenaska holds options across four counties (Flatwater Free Press; Omaha guide). |
| Texas Fort Worth | Winner LLC (Project Ernst) | Meta | 4500 Like Way campus; $199.8M FTW4 new-build permit (Fort Worth permit PB20-17288). |
| Virginia Chesterfield Co. | Peanut LLC (Project Peanut) | Three shells totaling $247.9M on Bermuda Hundred Rd; Google named in Aug 26, 2026 county deck (Richmond Q3 report). | |
| Wisconsin Beaver Dam | DEGAS LLC | Meta | Beaver Dam air permit under NAICS 518210 (EPA ECHO; Wisconsin guide). |
| Wyoming Cheyenne | Project Tembo (ex-Project Jade) | Google + Tallgrass | 1.8 GW campus on 716 acres at Switchgrass Industrial Park (Cap City News; Cheyenne guide). |
Sources: primary municipal, state, federal EPA ECHO, SEC EDGAR, and corroborated local filings linked in each row, checked November 24, 2026. None of these campuses is open multi-tenant inventory.
Verified merchant-operator and developer SPVs
Commercial operators and wholesale developers also register each campus under a property-level LLC or partnership. Identifying the developer tells you whether a project is merchant wholesale, build-to-suit, or edge colocation, though an approved filing still does not prove open space.
| State & location | Filing LLC or codename | Verified developer | Scope and primary record |
|---|---|---|---|
| Illinois Coal City | Aligned Data Centers (Coal City) PropCo, LLC (Project Heartland) | Aligned | Nine planned buildings on ~307 to 320 acres in Grundy County (utility memo; Chicago Q3 report). |
| Kentucky Eastern KY | DB Long Hunts Data LLC (Muskie Campus) | TeraWulf | 1 GW contracted power with Kentucky Power across two 500 MW phases (Oct 2026 Form 8-K). |
| Ohio New Albany | PowerConneX | EdgeConneX affiliate | Up to ~430 MW on-site gas energy center for New Albany North (Ohio EPA draft permit; Columbus Q3 report). |
| Ohio Butler Co. | Project Mila | Prologis | 250 MW, 899,065 sq ft campus at Trenton Industrial Park (WVXU; Cincinnati guide). |
| Pennsylvania Big Beaver | Wampum 1 LLC | Switch, Ltd. | Three 215,750 sq ft buildings on ~384 acres (borough review letter; Pittsburgh Q3 report). |
| Pennsylvania Shippingport | Project Phoenix | Aligned | Phase 2 Beaver County campus (borough minutes; Pittsburgh Q3 report). |
| Texas Hutto | Hutto Data Center Campus, LLC & Hutto Data Center 3, LLC | Skybox | PowerCampus Austin Bldg 4, $550M and 846,300 sq ft (TDLR TABS2027002367). |
| Texas Garland | Digital Garland 2C, L.P. | Digital Realty | 80 MW across ten 8 MW suites, $300M, 672,000 sq ft (TDLR TABS2027000488). |
| Texas Wilmer | SDC DFWC, LP | Stream | 48 MW DFWC1 building plus substation, $300M (TDLR TABS2026001400). |
| Texas Taylor | Project Mustang | Big Watt / PowerHouse | 664-acre Taylor Technology Campus annexation agreement (City of Taylor release). |
| Texas Willacy Co. | Soluna KK Energy Service Co LLC (Project Kati II) | Soluna | 112 MW critical IT AI campus, $471.8M, 471,884 sq ft (TDLR TABS2027003019). |
| Texas Potter Co. | GKC Operating, LLC | Zone Frontier | 4,077-acre ground lease near 345 kV substation (Sept 2026 Form 8-K). |
| Virginia Stafford Co. | Falmouth Tech LLC | Tradition Cos. | Accokeek Center rezoning RC24155981, ~122 MW Dominion service (Stafford agenda; news brief). |
| Wisconsin Beaver Dam | CLOP Madison WI, LLC | Oppidan | 90,000 sq ft edge build (Beaver Dam minutes). Same CLOP naming appears on Cedar Rapids, IA and Olathe, KS records. |
Sources: linked state registrations, municipal records, EPA ECHO files, and SEC Form 8-K disclosures checked November 24, 2026. For Rowan Digital Infrastructure's Project Pirate in Medina County, Texas (~340 acres), see our San Antonio Q3 permit report.
Major filings where the end user remains undisclosed
Large data center filings frequently move through state accessibility portals, county rezoning boards, and federal air registries without naming the tenant or ultimate parent. We track these entities under their exact filed names and do not speculate on ownership until a primary record confirms it.
| State & location | Filing LLC or codename | Owner status | Scale and primary record |
|---|---|---|---|
| Alabama Montgomery | Dotier, LLC | Undisclosed | 1053 Hyundai Blvd; NAICS 518210 synthetic minor air permit (EPA ECHO; Alabama guide). |
| Georgia Putnam Co. | Eatonton 379 | Undisclosed | 520 MW, $3.5B, 11-building campus on 543 acres (GA DCA DRI 4861; analysis). |
| Georgia Coweta Co. | Project Peach | Undisclosed | Construction drawings filed Sept 30, 2026 near Palmetto (Coweta filing; Atlanta Q3 report). |
| Indiana 4 counties | Woodland Caribou LLC; Lavender Fields Holdings LLC; Orla LLC; DX Hammond JV LLC | Undisclosed in EPA file | Four NAICS 518210 air-register shell LLCs; Woodland Caribou in Mooresville holds operating and under-construction records (EPA ECHO; Indiana guide). |
| Louisiana W. Feliciana | River Bend DC LLC | Undisclosed | Phase 2 site plan and zoning map notices near St. Francisville (Oct 2026 parish notice). |
| Minnesota Farmington | Mnlco Farmington LLC | Undisclosed | Farmington Technology Park demolition permit FA062506 (city permit; Minneapolis guide). |
| Mississippi Southaven | MZX Tech | Undisclosed in agenda | Stanton Rd / Tulane Rd design review (Sept 1, 2026 agenda); reported locally as Southaven Gun Range Datacenter. |
| Pennsylvania Forward Twp. | 614 Prospect Road LLC (Misty Hollow) | Undisclosed | 1,000,000 sq ft footprint and 300 MW on-site generation on 274 acres (township application; Pittsburgh Q3). |
| South Carolina Spartanburg Co. | Numara LLC & Valara Holdings LLC; 300 Jones Road Associates LLC; AIB CLT1 LLC | Undisclosed | Three Nov 3, 2026 council agreements covering 457 MW ($2.76B, EPA ECHO), 65 IT MW, and 50 IT MW (county packet; analysis). |
| South Carolina Berkeley Co. | Maguro Enterprises LLC | Undisclosed | 1669 Garrott Ave, Moncks Corner; Major Emissions NAICS 518210 air record (EPA ECHO; SC guide). |
| Texas Quanah | 19000-200 Holdings, LLC (Clocktower NWB 05) | Undisclosed | $8.0B, 288,355 sq ft registration in Hardeman County; no tenant assigned (TDLR TABS2027004544; analysis). |
| Texas Denton | Project Birddog | Undisclosed | Specific Use Permit S26-0006 for 23.8 acres off E. University Dr (Denton GIS; news brief). |
| Virginia Roanoke Co. | Clearview Dynamics LLC | Undisclosed | Wood Haven Technology Park due diligence; power load under review (Roanoke County page). |
| Virginia Loudoun Co. | Lohrasp Enterprise II LLC (LC3) | Unnamed IG hyperscaler | ~80 MW building 100% leased triple-net to one investment-grade hyperscaler (KBRA Jul 2026; SEC lease study). |
| Wisconsin Menomonie | Balloonist, LLC | Undisclosed | CTH B annexation and I-1 rezoning approved Aug 2025 (city minutes). |
Sources: linked primary government, EPA ECHO, TDLR, and KBRA filings checked November 24, 2026. Entities listed above remain unattributed in public documents reviewed to date.
Four ways to verify who is behind a local data center filing
When a mystery LLC appears on a county agenda or utility docket near your target market, four public-record checks usually separate an enterprise-accessible colocation build from a closed hyperscaler site.
1. Filter EPA ECHO by NAICS 518210
Backup diesel and gas generators require air permits. Filtering federal EPA ECHO records by industry code 518210 (Data Processing and Hosting) surfaces shell LLCs whose names never mention "data" or "digital."
2. Pivot from applicant name to street address
Municipal portals often list an engineering firm or holding LLC as the applicant. Searching the same parcel or private street name (such as Zodiac Way or Bermuda Hundred Road) pulls up earlier site plans, staff decks, or utility memos naming the operator.
3. Check state-level filings and utility dockets
Texas TDLR accessibility registrations, Georgia Developments of Regional Impact (DRIs), and state power-siting boards often publish square footage, MW load, and estimated construction cost months before local building permits appear.
4. Cross-check SEC Form 8-K and 10-Q exhibits
When a public landlord signs a hyperscaler lease or closes project financing, SEC exhibits often disclose the exact subsidiary name and parent guarantee (as CleanSpark's presentation did for Meta's Anviran, LLC).
Need to know which local builds you can actually lease?
Permits and shell LLCs show where power is going, not where cages or suites are open for your timeline. Share your target market, kW load, and target date, and we verify real multi-tenant availability directly with operators.
Attribution rules and data boundaries
Every entry on this page comes from public records collected and verified by Colocation Scout as of November 24, 2026:
- Strict primary attribution. A shell LLC or codename is linked to a parent company only when a government record, SEC disclosure, or named local official confirmation establishes the link. Where public filings leave the end user blank, the table says undisclosed.
- Permits and LLC records are not availability. A land purchase, rezoning, air permit, or TDLR registration proves regulatory activity, never space available to lease. For verified open space today, check available data center capacity.
Related research: U.S. data center construction pipeline, data center construction cost and permit timelines, Q3 2026 signed SEC lease rates, utility power pipeline tracker, and quarterly permit reports by market.