Market guide / Lehigh Valley, Reading and Camp Hill

Lehigh Valley capacity needs a building-level comparison.

TierPoint appears in the air register at Breinigsville and two Bethlehem addresses. Reading and Camp Hill are separate locations in the same regional guide, not interchangeable parts of one metro.

Lehigh Valley, Reading and Camp Hill data center and colocation evidence
Market profile

What the public evidence can tell you

The strongest overlap is at TekPark and Bethlehem: public air records and PeeringDB name the same sites. This gives a buyer a starting list of buildings to investigate. It does not disclose open racks, sellable power or pricing. Reading and Camp Hill remain separate comparisons because an acceptable location for one requirement may be too far away for another.

Three locations, three searches

Breinigsville and Bethlehem

The air register names TekPark at 9999 Hamilton Boulevard and the two Bethlehem addresses shown below. TierPoint network listings appear at those addresses too. The announced TekPark power expansion is a separate measure from the capacity a customer can contract today. TierPoint targeted it for the second half of 2026. The utility work behind it was still in approval in August 2026. The TierPoint substation plan was on the Upper Macungie supervisors' 6 August agenda, and PPL's new lines to TekPark were before the state utility commission. Ask TierPoint for a current delivery date.

Reading

The Direct LTx air record and PeeringDB listing provide a public starting point in Reading. A second PeeringDB entry carries no registered networks. That absence is a limitation of the listing, not proof that the building lacks connectivity.

Camp Hill

The HP Enterprise air-register entry is the evidence here. The name is out of date. HP Enterprise Services merged into DXC Technology in 2017, so the register has not caught up. Our collected PeeringDB export has no Camp Hill entry, and this guide does not substitute a Lehigh Valley network total for local connectivity. Confirm the current operator and service offering before shortlisting the site.

Air-register evidence, not a construction schedule

All five air-register entries are undated in the collected data. They identify permitted sites but do not measure this year's construction rate. The entries retain the applicant names and register statuses below; these are not confirmations of current sales availability.

Air-register records in the Lehigh Valley, Reading and Camp Hill, compared as separate locations. Every figure below is a count of filings we collected ourselves, and every row links to the record it came from.

Our collectionNo filing dates published8 filings tracked
MeasureFigureWhat it means
Filings we track8Deduplicated. One source, which publishes no filing dates
Distinct addresses5Separate sites in the record, not separate buildings
Operators we can name16 of 8 filings name a recognizable operator. The rest name an engineer, a builder or a holding company
Filings with no date published8The source publishes the facility, not the filing date

Operators appearing by name: TierPoint (6).

The filings on the record

FiledNamed on the filingWhat it saysType
No date publishedNot an identifiable operatorDirect Ltx/Bern Twp FacPower and cooling
No date publishedNot an identifiable operatorHp Enterprise Svc Llc/Camp HillPower and cooling
No date publishedTierPointTierpoint Llc/Bethlehem 2 Data CtrPower and cooling
No date publishedTierPointTierpoint Pennsylvania Two LlcPower and cooling
No date publishedTierPointTierpoint Two, Llc - Tekpark FacilityPower and cooling
No date publishedTierPointTierpoint Llc/Bethlehem 2 Data CtrPower and cooling
No date publishedTierPointTierpoint Pennsylvania Two LlcPower and cooling
No date publishedTierPointTierpoint Two, Llc - Tekpark FacilityPower and cooling

Collected from EPA ECHO air facility records for Pennsylvania. A permit or air-register entry documents a site or proposed work. It does not establish current construction or available space, and no public filing anywhere discloses what is contractible at a named building. That answer comes from an operator call, which is the part we do by hand. See how we verify capacity.

Check the underlying records

These public entries were checked against our collected data on 24 September 2026. Each link opens its EPA record. A register status does not establish a current commercial offering.

Registered applicant and recordAddressRegister status
DIRECT LTX/BERN TWP FAC2561 BERNVILLE RD, READING 19605-9611Operating
HP ENTERPRISE SVC LLC/CAMP HILL225 GRANDVIEW AVE, CAMP HILL 17011-1712Operating
TIERPOINT LLC/BETHLEHEM 2 DATA CTR3864 COURTNEY ST, BETHLEHEM 18017-8987Operating
TIERPOINT PENNSYLVANIA TWO LLC3949 SCHELDEN CIR, BETHLEHEM 18017-8936Operating
TIERPOINT TWO, LLC - TEKPARK FACILITY9999 HAMILTON BLVD, BREINIGSVILLE 18031-9300Operating

Where network operators list a presence

The following counts are PeeringDB listings. A network listed in more than one building contributes a presence at each; these are not unique regional carrier counts. Multiple registry entries can also refer to the same property. Confirm the required carriers and routes at the exact address.

Who is actually plugged in across Lehigh Valley, Reading and Camp Hill

A building existing and a building being connected are different facts, and only one of them decides whether your traffic can get where it needs to go cheaply. These figures come from PeeringDB, which the network operators themselves maintain. Any building below can be looked up there by name.

Public record7 buildings listed10 network presences
MeasureFigureWhat it means
Buildings listed7Registered in PeeringDB across Lehigh Valley, Reading and Camp Hill, by 4 operators
Buildings with a network present43 carry no network presence, which usually means single tenant or simply unregistered
Network presences10Counted per building, so a carrier in three buildings counts three times
Internet exchange presences1Where you can reach many networks through one port instead of many cross-connects
Carrier presences3The physical transport choice you can buy without leaving the building
In the densest building50%TierPoint Allentown-TekPark holds 5 of the market's network presences

The most connected buildings here

NetworksBuildingOperatorExchangesCarriers
5TierPoint Allentown-TekParkTierPoint, LLC01
2TierPoint Lehigh ValleyTierPoint, LLC11
2TierPoint BethlehemTierPoint, LLC01
1Direct LTx ReadingDirectlink Technologies Corp.00

From PeeringDB, which is maintained by the network operators present in these buildings rather than by the landlords, which is what makes it worth more than a directory. Two limits. Entries are voluntary, so a building showing no networks may be single tenant or may simply never have registered. And a network being present says nothing about whether the building has space, power or a price for you: that is still a call.

Facility inventory coverage

Our committed verified-inventory snapshot has no separate coverage for this region. We therefore publish no inventory count or available-space estimate here. Public air and network records remain separate evidence, with their own limits. See what verified building means.

What has been announced in Lehigh Valley, Reading and Camp Hill

Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below links to a published report that states it, and was checked against at least one other independent report before it was written down.

Announced, not filed1 projectLargest: 100 MW
CapacityOperatorProjectWhat was announced
100 MWTierPointTekPark power expansion, BreinigsvilleTierPoint announced the expansion on October 23, 2025 with completion targeted for the second half of 2026. Data Center Dynamics independently reported the same power figure and target. The utility work was still in approval in August 2026: the substation was on Upper Macungie Township's 6 August agenda and PPL's lines were before the Public Utility Commission. Ask for a current date. This review has not confirmed completion or the unleased portion. The figure is not added to existing capacity to invent a campus total. Announced campus power expansion, not a stated 100 MW of sellable critical IT load
Read this before quoting any of it

TekPark is the expansion supported by the sources reviewed here. Its power-infrastructure figure must not be treated as available IT capacity. There is no independently corroborated new-capacity figure in this review for Reading or Camp Hill; that is a research gap, not a claim that development is absent. Read the reporting.

Announced capacity is collected by hand from trade reporting and company statements, and each figure links to the report it came from. It is kept apart from the permit record above and never added to it: one is a document a jurisdiction issued, the other is a plan a company published. Neither is availability.

TierPoint's announcement and Data Center Dynamics' report agree on the expansion figure. Both use a power basis; neither establishes a current offer of that much IT load.

How to compare an actual requirement

Compare the Lehigh Valley with Philadelphia and New York and New Jersey when carrier choice matters. Keep Reading and Camp Hill on separate rows in the comparison. Ask each operator for the same power increment, cooling specification and delivery date so the quotes answer the same question.

Ask for a dated answer

Request the sellable IT load, rack density, cooling method, carrier access and ready-for-service date in writing. Distinguish power already delivered from power that depends on utility work. Record whether a quote reserves space and how long that reservation lasts.

Pricing context. This guide carries no posted list price for this region yet. A number here comes from a quote. For per kW and per MW figures by market, see the pricing benchmarks. The cost estimator gives an illustrative range based on Ashburn. Use it as a reference point, not a local price.

Lehigh Valley, Reading and Camp Hill search

Test the shortlist against your power, density and date.

Bring the requirement. A scout can ask operators for confirmed capacity and compare the responses on the same terms.

From the research desk

Latest market developments

All news & analysis
Development & Power

Kline Township, Pennsylvania approves Amazon's 350-acre data center plan with a nine-page list of conditions, per local reports

Kline Township supervisors in Schuylkill County, Pennsylvania unanimously approved Amazon's proposed data center plan at a special meeting on September 30, 2026, according to local reports. The roughly 350-acre site near Route 309 and Interstate 81 would hold about 2 million square feet of data center buildings. The approval carries a nine-page list of conditions, and state approvals remain. [Source 1] [Source 2]

Kline Township, Schuylkill County, Pennsylvania · Approved (township supervisors approved the plan with conditions on September 30, 2026, per local reports). Zoning permits and state approvals remain pending. No construction, power or capacity status disclosed.
Source: WILK (Audacy)