3
sites in the Denver metro filed to add data center capacity, all in Aurora: QTS's DEN1 campus and two new campus site plans. The one stated figure is 22.5 MW, QTS's, in DC1.
0
new-building permit filings in the reviewed Denver metro records. Colorado Springs building permits are not in the record, so its count is unknown.
6
towns adopted a data center moratorium, three around each metro. None of the three Colorado Springs towns had a data center application pending.
Aurora, where every Denver metro filing to add data center capacity was made, was the one council to reject a pause: 6-5 on 10 August, the mayor breaking the tie.
Operating facilities on the map (30)
The small hollow grey dots are data centers operating today, from the public PeeringDB facility list, each linked to its PeeringDB record. An operating building is context for the filings and is in no count on this page.
| Operator | Facility | City | Record |
|---|---|---|---|
| 365 Data Centers | 365 Data Centers Aurora (CO1) | Aurora | peeringdb.com/fac/16128 |
| Centersquare | Centersquare Denver (DEN1) | Highlands Ranch | peeringdb.com/fac/2621 |
| Centersquare | Centersquare Denver (DEN2) | Englewood | peeringdb.com/fac/2623 |
| ColoradoColo | ColoradoColo - Lakewood (LKWD) | Lakewood | peeringdb.com/fac/14149 |
| CoreSite | CoreSite - Denver (DE1) | Denver | peeringdb.com/fac/389 |
| CoreSite | CoreSite - Denver (DE2) | Denver | peeringdb.com/fac/1229 |
| Data102 | Data102 - COS01 | Colorado Springs | peeringdb.com/fac/8223 |
| Data102 | Data102 - COS02 | Colorado Springs | peeringdb.com/fac/8224 |
| DataBank, Ltd. | DataBank Denver (DEN1) | Englewood | peeringdb.com/fac/2977 |
| DataBank, Ltd. | DataBank Denver (DEN2) | Centennial | peeringdb.com/fac/2198 |
| DataBank, Ltd. | DataBank Denver (DEN3) | Denver | peeringdb.com/fac/10920 |
| DataBank, Ltd. | DataBank Denver (DEN4) | Westminster | peeringdb.com/fac/10921 |
| DataBank, Ltd. | Databank Denver (DEN5) | Centennial | peeringdb.com/fac/16588 |
| EdgeConneX Inc. | EdgeConneX Denver (EDCDEN01) | Englewood | peeringdb.com/fac/1875 |
| Equinix, Inc. | Equinix DE1 - Denver | Englewood | peeringdb.com/fac/4443 |
| Equinix, Inc. | Equinix DE2 - Denver | Denver | peeringdb.com/fac/696 |
| Flexential Corp. | Flexential - Denver/Aurora (DEN03) | Aurora | peeringdb.com/fac/2438 |
| Flexential Corp. | Flexential - Denver/Centennial (DEN05) | Centennial | peeringdb.com/fac/2449 |
| Flexential Corp. | Flexential - Denver/Downtown (DEN02) | Denver | peeringdb.com/fac/2450 |
| Flexential Corp. | Flexential - Denver/Englewood (DEN11) | Englewood | peeringdb.com/fac/2439 |
| H5 Data Centers | H5 Data Centers Denver | Greenwood Village | peeringdb.com/fac/3071 |
| IPI Partners, LLC | 1500 Champa | Denver | peeringdb.com/fac/1440 |
| Iron Mountain Data Centers | Iron Mountain Data Center - Denver (DEN-1) | Denver | peeringdb.com/fac/1896 |
| Lumen Technologies Inc | Level(3) Denver | Denver | peeringdb.com/fac/1221 |
| Massive Networks | LSVL-CTC1 | Louisville | peeringdb.com/fac/13111 |
| OneNeck IT Solutions LLC | US Signal CO01 - Denver | Englewood | peeringdb.com/fac/12305 |
| Sungard Availability Services | Sungard AS Aurora | Aurora | peeringdb.com/fac/10865 |
| Sungard Availability Services | Sungard AS Thornton | Thornton | peeringdb.com/fac/11867 |
| T5 Data Centers | T5@Colorado Springs | Colorado Springs | peeringdb.com/fac/11932 |
| Zayo Group | Zayo Networks | Louisville | peeringdb.com/fac/1049 |
What happened this quarter
Three sites filed, all in Aurora
Three sites in the Denver metro filed to add data center capacity, all in Aurora. At QTS's DEN1 campus, DC1 filed a 22.5 MW fit-out of two data halls and matching 22.5 MW power work, neither issued by the end of September. Work inside an already permitted data center counts only when its filing states added power. So QTS's DC3 fit-out and build-out, which state none, are not counted; nor is CoreSite's DE3 in Denver, whose four September permits for a "2nd story data center buildout" add cooling units and a chiller with no power figure.
Two new campuses were submitted in Aurora
Two data center campus site plans were submitted to Aurora in the quarter and reported by the press before 1 October (Denver Gazette): 1,000,000 square feet on 500 acres at the Aerotropolis Logistics Center (application 26-2645716), its documents in the record submitted 11 August, and the TEL01 campus, 1,542,300 square feet on 260 acres (application 26-2657108). In the portal, open Project List and search the project number, 1994428 or 2005880. The city has not yet accepted either; both records read an application date of 12 October. No new-building permit filing appears in the reviewed Denver metro records. Afterward, Mayor Mike Coffman said Vantage's Trident plan "must be stopped" (Denver Gazette, news coverage).
Six towns paused. Aurora chose rules instead.
Six towns adopted a data center moratorium, three around each metro. In the Denver metro: Broomfield on 7 July (ordinance; Colorado Politics, news coverage), Commerce City on 21 September (ordinance) and Thornton on 22 September (ordinance). Around Colorado Springs: Woodland Park on 16 July (minutes), Monument on 20 July (draft minutes) and Palmer Lake on 10 September (draft minutes). Aurora rejected a moratorium 6-5 on 10 August, the mayor breaking the tie (Denver7, news coverage), and asked staff for rules, 7-4 (CPR News). On 28 September it banned new evaporative cooling, unanimous as reported (Sentinel Colorado).
Colorado Springs: one new case, one long wait
Vineyards Research Park (city record, filed 7 July) is Colorado Springs' one planning case this quarter. The city record describes two 110,000 square foot light industrial and office buildings; the applicant describes a GPU test lab (Gazette, news coverage). The city approved it; an appeal was filed on 30 September (appeal record). Project Taurus kept its approval with a 50 MW cap when the Planning Commission denied the appeals 6-2-1 on 23 July (minutes). On 17 September the council postponed the final appeal to 13 April 2027 (council record).
These figures may change before the final edition. A filing is not space anyone can lease.
Sites adding data center capacity, by quarter
What to watch
- 6 October 2026: Brighton's council takes up a 90-day pause after an eight-building campus rezoning request (Denver7, news coverage); Arvada hears an 18-month moratorium (city recap).
- 21 to 28 October 2026: the Public Utilities Commission hears Xcel's large-load tariff for loads of 50 MW or more (Proceeding 26AL-0137E; dates in Decision C26-0467), suspended until 8 January 2027.
- 13 April 2027: Colorado Springs City Council hears the Project Taurus appeals. The Vineyards appeal has no date yet.
The records
Every project in the record, Q1 2025 to Q3 2026 (Denver metro 10, Colorado Springs 2)
| Quarter | First filed | Permit first issued | Where | The work | Type | Metro | Declared value | Public records |
|---|---|---|---|---|---|---|---|---|
| Q1 2025 | 19 February 2025 | Q3 2025 18 August 2025 | Aurora: 1140 N GUN CLUB RD, Aurora, CO | DEN1-DC2 Data Center - New Building - Storage Warehouse And Guard Shack, Gating System | New building | Denver metro | $305 million | 25-2509129-000-00, 25-2513934-000-00 |
| Q1 2025 | 21 February 2025 | None on record | Thornton: no site address in the record | Washington Datacenter (Farren) / Comprehensive Plan Amendment, Zoning Amendment, and Conc... | Planning case | Denver metro | Not stated | {B5412A21-05FA-48D6-9B63-A6E65450349F} |
| Q1 2025 | 19 March 2025 | Q3 2026 28 July 2026 | Aurora: 1100 N GUN CLUB RD, Aurora, CO | DEN1-DC3 Storage Use Building - Core And Shell | New building | Denver metro | $305 million | 25-2515310-000-00, 25-2519410-000-00 |
| Q3 2025 | 25 August 2025 | None on record | Aurora: 23001 E 48TH AVE, Aurora, CO | Trident Data Center At Windler - Site Plan | Planning case | Denver metro | Not stated | DA-1707-46 |
| Q1 2026 | 12 March 2026 | None on record | Colorado Springs: 1565 High Tech Way, Colorado Springs, CO 80907 | Project Taurus - Data Center Use In Existing Building | Planning case | Colorado Springs | Not stated | DEPN-26-0039 |
| Q1 2026 | 24 March 2026 | None on record | Aurora: 1140 N GUN CLUB RD, Aurora, CO | QTS DEN1 DC2, 60 MW Fit Out - Hot Aisle Containment Tenant Improvement | Data hall fit-out | Denver metro | $252 million | 26-2613720-000-00, 26-2614863-000-00 |
| Q2 2026 | 15 April 2026 | Q3 2026 6 July 2026 | Aurora: 1160 N GUN CLUB RD, Aurora, CO | QTS DEN1 DC1 6 MW Tenant Improvement - Fit Out Data Hall Interior Remodel | Data hall fit-out | Denver metro | $41.1 million | 26-2618176-000-00, 26-2618196-000-00, 26-2629045-000-00, 26-2629108-000-00 |
| Q3 2026 | 1 July 2026 | None on record | Aurora: 1160 N GUN CLUB RD, Aurora, CO | QTS DEN1 DC1, 22.5 MW TFO | Data hall fit-out | Denver metro | $19.3 million | 26-2636052-000-00, 26-2648528-000-00 |
| Q3 2026 | 1 July 2026 | None on record | Aurora: 1160 N GUN CLUB RD, Aurora, CO | QTS DEN1 DC1, 22.5 MW ESB | Data center power or cooling | Denver metro | $35.8 million | 26-2636081-000-00, 26-2648292-000-00 |
| Q3 2026 | 7 July 2026 | None on record | Colorado Springs: 3819 Janitell Rd, Colorado Springs, CO 80906 | Vineyards Research Park - New Development Plan | Planning case | Colorado Springs | Not stated | DEPN-26-0087 |
| Q3 2026 | 11 August 2026 | None on record | Aurora: no site address in the record | Data Center Project at Aerotropolis Logistics Center - Site Plan | Planning case | Denver metro | Not stated | 26-2645716 |
| Q3 2026 | 25 September 2026 | None on record | Aurora: no site address in the record | TEL01 Data Center Campus - Site Plan and Plat | Planning case | Denver metro | Not stated | 26-2657108 |
Where two records differ in value, the larger is shown.
State air permits, 2025 to 2026 (none in Q3 2026)
| Date | Facility, as the state names it | What happened | Permit |
|---|---|---|---|
| 23 February 2026 | Edgeconnex, Inc - Denver Campus | Construction permit issued | 25DG0038 |
| 30 January 2026 | Flexential - Den03 Data Center | Application received | 26AR0257 |
| 17 November 2025 | Amazon Data Services - Den-22 | Application received | 19AR0178 |
| 17 July 2025 | Coresite Real Estate DE3 - Coresite DE3 | Construction permit issued | 24DE0836 |
| 8 July 2025 | Quality Technology Services - QTS DEN1 | Modification application received | 22AR0210 |
| 16 May 2025 | Edgeconnex, Inc - Denver Campus | Application received | 25DG0038 |
| 7 March 2025 | Quality Technology Services - QTS DEN1 | Construction permit issued | 22AR0210 |
Colorado Air Pollution Control Division documents for data centers in the eight counties, from the state's public records system. None fall in Q3 2026. A generator permit rating is backup plant, not the capacity a customer can use, so no rating is shown as megawatts of space. If a state link has expired, search the permit number at the Colorado records portal.
Government actions, 2026
- Denver City Council: one-year moratorium on data center zoning and site plans (26-0431).
- Jefferson County: 10-month moratorium (county notice).
- Broomfield: Ordinance 2313, 18 months, unanimous as reported (Colorado Politics).
- Woodland Park: Ordinance 1525, 18 months, 7-0 (minutes).
- Monument: Ordinance 18-2026, six months, 6-0 (draft minutes).
- Colorado Springs Planning Commission: Project Taurus appeals denied 6-2-1, utility use capped at 50 MW (minutes).
- Aurora City Council: moratorium rejected 6-5 (Denver7); resolution to draft regulations adopted 7-4 (CPR News), as reported.
- Douglas County: 35-year property tax rebate for Flexential's Parker data center, unanimous (county release).
- Colorado Springs City Council: Buckingham Drive rezoning conditioned to bar data centers, Ordinance 26-38 (record).
- Palmer Lake: Resolution 31-2026, temporary moratorium, 4-0 (draft minutes).
- Colorado Springs City Council: Project Taurus appeal hearing postponed 7-2 to 13 April 2027 (record).
- Commerce City: six-month moratorium, 7-1 as reported (Westword).
- Thornton: 12-month moratorium on data centers over 50,000 square feet, 5-3 as reported (BusinessDen).
- Aurora City Council: evaporative cooling ban, final reading, unanimous as reported (Sentinel Colorado); first reading 14 Sep (Denver Gazette).
Unverified projects, not counted (Denver metro 7, Colorado Springs 2)
- Microsoft, Aurora. About 260 acres near East 56th Avenue and E-470, bought in 2022 (BusinessDen); no record links it to the TEL01 campus.
- NTT Global Data Centers, Aurora. 300,000 square feet under a 2025 incentive agreement, as reported (Sentinel Colorado); no application filed.
- Eight-building campus, Brighton. Rezoning confirmed by the city (Denver7); the site may lie in Weld County, outside the boundary.
- CoreSite DE3, Denver. A second- and third-story data center build-out with new cooling (city record); no power figure, so not counted. QTS DEN1's DC3 fit-out (city record) and build-out (city record) state none either.
- Centersquare DEN2, Douglas County. A chiller, generator and IT equipment plan (county record) and a $34 million tenant finish (county record) at an operating data center; neither states a power figure.
- Earlier build-outs with no power figure. QTS DEN1 DC2's six white boxes, 2025 (city record); 12396 Grant St, Thornton, 2025, expired unissued (city record); a UPS and cooling addition at 4643 S Ulster St, Denver, 2026 (city record). Each is inside an existing data center and states no added power.
- Iron Mountain DEN-1 COLO 5, Denver. Fire records name a build-out; the tenant finish permit (city record) states no scope.
- Novva, 650 Sybilla Lane, Colorado Springs. Growth to 30 MW, announced in 2021 (DCD); no application for new space found.
- Utility power requests, Colorado Springs, reported by the Pikes Peak Bulletin: 12710 Voyager Parkway, 50 MW; 1575 West Garden of the Gods Road, 90 MW, on the Project Taurus campus; Peak Innovation Park and the airport area, four requests, 60 to 500 MW; an existing customer, 72 MW. Operators and filings unconfirmed.
Coverage and method
Boundary. Denver metro: Denver, Arapahoe, Adams, Douglas, Jefferson and Broomfield counties. Boulder and Weld counties are separate metropolitan areas; Lochbuie is outside. Colorado Springs: El Paso and Teller counties.
Records read. Denver metro: Aurora building permits, development cases and its development portal's project list by data center wording and QTS; Denver, Douglas County, Thornton, Centennial and unincorporated Adams County permits and planning records at known data center addresses or by wording, all partial. Searched, no data center case since 2025: Jefferson County, Littleton, Westminster, Lakewood, Lone Tree. Not collected: Parker, Brighton, Commerce City, Broomfield, Castle Rock, Englewood, Greenwood Village, unincorporated Arapahoe. Colorado Springs: planning cases and City Council, Planning Commission and Utilities Board records by wording and at known addresses; building permits (regional building department) are not in the record; no applications were identified in the other El Paso and Teller towns. Moratorium records: Denver, Jefferson County, Broomfield, Commerce City, Thornton, Monument, Palmer Lake, Woodland Park. State: Air Pollution Control Division generator permits for data centers in the eight counties, listed and never counted; the Public Utilities Commission's large-load tariff case. These sources cover all seven quarters, Q1 2025 to Q3 2026, alike.
What is counted. Only permitting that adds data center buildings or capacity: new buildings and the jobs filed for them, planning cases for new data center sites, and, inside a data center already permitted, work whose filing states added power with a figure. Cooling or build-out work there with no power figure does not count, nor do replacements, repairs, renovations, fire and life-safety work, renewals and amendments; QTS's 3 MW liquid-cooling conversion converts a hall already in use. Aurora's two 2026 site plans not yet accepted count as planning cases: both were reported in the city portal before 1 October. Aerotropolis is dated 11 August, the submission date on its documents in the record; TEL01, with none, by its application number, 25 September, which the city issues in one sequence with its permits. Each record reads an application date of 12 October. A site is one address or one campus and counts once in a quarter in which it files, however many permits it files. A project is one piece of work however many records it has, dated by its first filing.
Certificates of occupancy. One since January 2025 at a data center address in the record: Denver's temporary certificate for the CoreSite DE3 building, 2026-OCCUPANCY-0000577, finaled 13 August 2026, a month before its data center build-out permits were filed. A certificate marks a building finished, never capacity available.
Sources and revisions
Every figure links to the public record it came from. News coverage is named as news and never counted. When this edition is final its figures are frozen; a later correction is added here with its date and reason.
Colocation Scout is run by a colocation sourcing consultant; the permit data is public and every row links to its filing. How we publish these reports.
Revisions: Correction: on 5 October 2026 the Denver metro Q3 figure changed from 1 to 3 sites when two Aurora site plans submitted in the quarter were counted. Edition status: provisional.
Cite this report as: Colocation Scout, "Denver metro and Colorado Springs data center permits, Q3 2026," colocationscout.com/denver-colorado-springs-data-center-permits-q3-2026.html