Q3 2026 Market Report / New York tri-state

New York tri-state data center permits, Q3 2026: New Jersey work and Hudson Valley proposals.

Data center applications, moratorium actions and environmental reviews in the covered New York City region. New Jersey records include three Q3 data center alterations. In the Hudson Valley, IBM's Poughkeepsie quantum facility cleared environmental review.

Covers New York City building filings, New Jersey state permits on known data center parcels, Newark council records, and town, planning and state notice records in the places we cover. Full list under Coverage and cutoff.

Final edition

Completed October 13, 2026. These figures are frozen, and any later correction is listed under Sources and revisions. The counts cover the records and places listed under Coverage and cutoff, not the whole region. A filing is not space anyone can lease.

0

sites filed to add data center capacity in the Q3 records we reviewed.

5

jurisdictions around New York City moved on data center moratoria between July and September: two adopted one, one backed one, and two held hearings with no outcome on record.

77,862

square feet is the data center DataBank now proposes at Orangeburg, down from 146,480, as its expansion went into full environmental review.

New Jersey recorded data center alteration applications at Evocative, CoreSite and Jane Street, while five local governments around New York City moved on moratoria.

What the Q3 records show

  1. No new data center building or stated power addition was filed in the Q3 records we reviewed. NJSEA records three New Jersey alteration applications, detailed below. None states added power. Manhattan filings mostly describe plant replacements. DataBank's Orangeburg proposal and Equinix NY10 predate Q3.
  2. Five jurisdictions around New York City moved on data center moratoria. Brookhaven's Town Board adopted one unanimously on August 13, according to its draft minutes. Orangetown adopted a town-wide moratorium on data centers and battery storage on August 25. Newark's council adopted a resolution supporting a 12-month moratorium on September 9, while the ordinance itself was returned to the administration. Islip held a public hearing on its moratorium law on August 11, and Trumbull on a two-year moratorium on September 9. The records for those two do not show the outcome.
  3. DataBank's Orangeburg expansion went into full environmental review, smaller. On July 8 the Orangetown Planning Board voted to require a full environmental impact statement for DataBank Phase II at 2000 Corporate Drive, WAMC reported. The state published the positive declaration on July 22. The notice describes a 77,862 square foot data center, down from 146,480, with a 22,571 square foot standby power equipment yard, down from 52,095. The public scoping session was held on September 9, and the board adopted the final scope on September 23.
  4. In the Hudson Valley, IBM's Poughkeepsie quantum facility cleared environmental review. On September 30 the state published the Town of Poughkeepsie Planning Board's negative declaration for four new buildings, about 372,958 square feet at 2455 South Road. Dutchess County's industrial development agency took up tax incentives for the roughly $2.51 billion project in July. The state notice describes quantum computer manufacturing and assembly, not leasable data center space. See the Hudson Valley section.
  5. Manhattan's carrier hotels mostly replaced plant rather than adding floors. On August 31 the city issued a $314,200 permit at 325 Hudson Street for two 30-ton energy recovery chillers. On August 13 it issued a $2,550,000 permit at 32 Avenue of the Americas to replace five fluid coolers. On September 16 a job to replace the fuel oil fill piping at 60 Hudson Street was filed. 60 Hudson Street also shows new equipment. On August 12 the city issued a $175,000 permit there, filed in 2025, for steel framing to support new mechanical and electrical equipment. A $750,000 permit to install a new emergency generator there was issued on May 7. Neither states added capacity. None of these filings names the tenant it serves.

Edison has a Q3 air authorization: NJDEP lists emergency-generator registration GEN260001 at Iron Mountain, 3003 Woodbridge Avenue, as approved with a September 4, 2026, start date. The register does not supply a generator rating or added IT load. This is an air-program authorization, not evidence of new leasable capacity.

In New Jersey the state lists pending air permit changes for CoreSite NY2/NY3 at 2 Emerson Lane and Equinix at 755 Secaucus Road in Secaucus, CyrusOne at 800 Cottontail Lane in Franklin Township and PNJ1 at 101 Possumtown Road in Piscataway. A pending application has no decision date, so none of the four is in the air permit table. A prior-year new-source air permit in the New Jersey record is CoreWeave's at 2000 Galloping Hill Road in Kenilworth, approved on October 23, 2025.

New Jersey: Q3 activity beyond the state construction feed

3 Q3 applications in the New Jersey Sports and Exposition Authority register identify work at Evocative, CoreSite and Jane Street. These are application receipts, not permit approvals or construction starts. None states added power. The capacity chart does not include them.

New Jersey Q3 applications
Project / locationApplication / receivedWork
Evocative
Secaucus, block 56, lot 3.02
26-301
Received July 10, 2026
Interior alterations.

The register identifies the operator but gives no equipment schedule or added power. Its 2025 entry 25-232 identifies data-center alterations on the same parcel.

CoreSite NY3
Secaucus, block 57, lot 5
26-322
Received July 24, 2026
Phase 3 deferred equipment.

The equipment entry gives no added-power figure. Phase 3 already appears in application 25-322, received July 30, 2025. This receipt does not establish a newly proposed campus.

Jane Street Group
600 Commerce, Carlstadt, block 131, lot 9.01
26-343
Received August 13, 2026
Interior alterations: data center and offices.

The entry explicitly names data-center work, but does not say whether the alterations create new capacity or state added power.

Source: NJSEA application registers. Links open the page containing each entry. The register covers applications submitted to NJSEA, including municipal opt-out filings. It is not a complete New Jersey building-permit register. Its short descriptions leave the scope of these alterations unresolved.

Earlier projects discussed during Q3: Equinix NY10 and 215 County Avenue

Equinix NY10, 275 Hartz Way: NJSEA's application 25-365 records a new-building submission on September 8, 2025. Secaucus's March 9, 2026, zoning agenda lists the site's parking, screening and tree variances as granted. These records precede Q3 2026. September reporting does not make the project a new Q3 filing.

215 County Avenue: September reporting identifies a CoreSite project. The town's zoning-board index dates its signed resolution to June 9, 2026. That posting predates Q3. The underlying application date and construction scope still need verification. Neither project is added to the Q3 capacity count.

Map of the New York City region. Brookhaven and Orangetown adopted data center moratoria in Q3 2026. Newark's council backed one, and Islip and Trumbull held hearings with no adoption on record. DataBank's Orangeburg Phase II is in full environmental review, three Manhattan carrier hotels filed plant replacement work, and CoreWeave's Kenilworth air permit was approved in October 2025.
Every point on the map is a filing linked on this page. Download the map (PNG). Reporters may republish the map with credit to Colocation Scout and a link to this page.
Operating facilities on the map (109)

The small hollow grey dots are data centers listed in the public PeeringDB facility list, each linked to its record. Listings marked closed are left off. A listed building is in no count on this page.

OperatorFacilityCityRecord
1025Connect (formerly LIDARC)1025ConnectWestburypeeringdb.com/fac/585
1101 Stewart Ave, Garden City1101 Stewart Ave, Garden CityGarden Citypeeringdb.com/fac/520
1547 Critical Systems RealtyORNY1Orangeburgpeeringdb.com/fac/10862
365 Data Centers365 Data Centers Bridgewater (BW1)Bridgewaterpeeringdb.com/fac/6085
365 Data Centers365 Data Centers Carlstadt (NJ3)Carlstadtpeeringdb.com/fac/15701
365 Data Centers365 Data Centers Commack (CNY)Commackpeeringdb.com/fac/8517
365 Data Centers365 Data Centers New Jersey (NJ1)Bridgewater Townshippeeringdb.com/fac/10349
365 Data Centers365 Data Centers New York (NY10)New Yorkpeeringdb.com/fac/2014
60 Hudson Owner LLC60 HudsonNew Yorkpeeringdb.com/fac/1517
Anexio Datacenters, LLCAnexio NJ1Piscatawaypeeringdb.com/fac/3771
Aphorio CarterAphorio Carter Trumbull Data CenterTrumbullpeeringdb.com/fac/4804
CentersquareCentersquare New Jersey (EWR2)Weehawkenpeeringdb.com/fac/2636
CentersquareCentersquare New Jersey (EWR3)Piscatawaypeeringdb.com/fac/2638
CentersquareCentersquare New Jersey (EWR5)Secaucuspeeringdb.com/fac/279
Cloudpath LLCCloudpath CT1 (26 Fahey St)Stamfordpeeringdb.com/fac/6334
Cloudpath LLCCloudpath CT19 (5 Landmark Sq)Stamfordpeeringdb.com/fac/10445
Cloudpath LLCCloudpath CT2 (1351 Washington Blvd)Stamfordpeeringdb.com/fac/10444
Cogent Communications, Inc.Cogent New York 1New Yorkpeeringdb.com/fac/4582
Colocation America CorporationNJDC1 - 100 Delawanna aveCliftonpeeringdb.com/fac/3430
Colocation America CorporationNJDC2 - 300 J F Kennedy BlvdSecaucuspeeringdb.com/fac/3431
Colocation America CorporationNYDC1 - 60 Hudson StreetNew Yorkpeeringdb.com/fac/3427
Colocation America CorporationNYDC2 - 111 8th aveNew Yorkpeeringdb.com/fac/3428
Colocation America CorporationNYDC3 - 11 skyline drHawthornepeeringdb.com/fac/3429
ColoCrossingColoCrossing NJ1Piscatawaypeeringdb.com/fac/6425
Cologix, Inc.Cologix NNJ2Cedar Knollspeeringdb.com/fac/2508
Cologix, Inc.Cologix NNJ3Parsippanypeeringdb.com/fac/2509
ColoHouse Premier DatacenterColoHouse New YorkOrangeburgpeeringdb.com/fac/10766
CoreSiteCoreSite - New York (NY1)New Yorkpeeringdb.com/fac/670
CoreSiteCoreSite - Secaucus (NY2)Secaucuspeeringdb.com/fac/1671
CoreSiteCoreSite - Secaucus (NY3)Secaucuspeeringdb.com/fac/16467
Crown Castle Inc.Crown Castle Brentwood (1650 Islip)Brentwoodpeeringdb.com/fac/356
Crown Castle Inc.Crown Castle New York (111 8th)New Yorkpeeringdb.com/fac/3491
Crown Castle Inc.Crown Castle Newark (165 Halsey)Newarkpeeringdb.com/fac/3486
Crown Castle Inc.Crown Castle StamfordStamfordpeeringdb.com/fac/13697
Crown Castle Inc.Crown Castle White Plains (360 Hamilton)White Plainspeeringdb.com/fac/13442
CyrusOne Inc.CyrusOne NJ-1Somersetpeeringdb.com/fac/2180
CyrusOne Inc.CyrusOne NorwalkNorwalkpeeringdb.com/fac/2357
CyrusOne Inc.CyrusOne TotowaTotowapeeringdb.com/fac/2356
DataBank, Ltd.DataBank New York (LGA1)New Yorkpeeringdb.com/fac/1422
DataBank, Ltd.DataBank New York (LGA2)New Yorkpeeringdb.com/fac/1819
DataBank, Ltd.DataBank Newark (EWR1)Newarkpeeringdb.com/fac/1820
DataBank, Ltd.Databank Orangeburg (LGA3)Orangeburgpeeringdb.com/fac/16587
DataBank, Ltd.DataBank Piscataway (EWR2)Piscatawaypeeringdb.com/fac/10922
Dataverge Inc.DatavergeBrooklynpeeringdb.com/fac/2686
Dataverge Inc.Dataverge Jersey CityJersey Citypeeringdb.com/fac/15092
Digital FortressDigital Fortress (PNJ)Piscatawaypeeringdb.com/fac/13023
Digital RealtyDigital Realty EWR (100 Delawanna)Cliftonpeeringdb.com/fac/908
Digital RealtyDigital Realty EWR (2 Peekay)Cliftonpeeringdb.com/fac/4773
Digital RealtyDigital Realty EWR (3 Corporate Pl)Piscatawaypeeringdb.com/fac/2979
Digital RealtyDigital Realty NYC (111 8th Ave)New Yorkpeeringdb.com/fac/16
Digital RealtyDigital Realty NYC (32 AofA)New Yorkpeeringdb.com/fac/120
Digital RealtyDigital Realty NYC (60 Hudson)New Yorkpeeringdb.com/fac/10
Encompass Digital Media, Inc.Encompass New York 111 8th AveNew Yorkpeeringdb.com/fac/6207
Encompass Digital Media, Inc.Encompass New York 60 HudsonNew Yorkpeeringdb.com/fac/6206
EpsilonEpsilon Global Hubs New York (60 Hudson)New Yorkpeeringdb.com/fac/569
Equinix, Inc.Equinix NY1 - New York, NewarkNewarkpeeringdb.com/fac/9
Equinix, Inc.Equinix NY2/NY4/NY5/NY6 - New York, SecaucusSecaucuspeeringdb.com/fac/36
Equinix, Inc.Equinix NY3 - New York, SecaucusSecaucuspeeringdb.com/fac/16827
Equinix, Inc.Equinix NY7 - New York, North BergenNorth Bergenpeeringdb.com/fac/542
Equinix, Inc.Equinix NY9 - New York, 111 8th AvenueNew Yorkpeeringdb.com/fac/38
EXA InfrastructureEXA Datacenter New YorkNew Yorkpeeringdb.com/fac/11971
FiberNet Telecom GroupFiberNet Telecom Group - 60 Hudson StNew Yorkpeeringdb.com/fac/188
FiberNet Telecom GroupFiberNet Telecom Group New York (111 Eighth Ave)New Yorkpeeringdb.com/fac/189
FiberNet Telecom GroupFiberNet Telecom Group Newark - 165 HalseyNewarkpeeringdb.com/fac/604
H5 Data CentersH5 Data Centers New YorkNew Yorkpeeringdb.com/fac/1816
H5 Data CentersH5 Data Centers Secaucus (NJ01)Secaucuspeeringdb.com/fac/3919
HostColorHost ColorNew Yorkpeeringdb.com/fac/1776
Interphase Communications, Inc.Interphase Data Center New York INew Yorkpeeringdb.com/fac/15243
Interphase Communications, Inc.Interphase Data Center New York IINew Yorkpeeringdb.com/fac/15276
InterServer, IncInterServer Teb2Secaucuspeeringdb.com/fac/8744
InterServer, IncInterServer Teb4Secaucuspeeringdb.com/fac/8745
Iron Mountain Data CentersIron Mountain Data Center - New Jersey (NJE-1)Edisonpeeringdb.com/fac/2011
JEMB Realty Corporation75 Broad StreetNew Yorkpeeringdb.com/fac/3926
Lefrak OrganizationNewport Financial CenterJersey Citypeeringdb.com/fac/330
Looking Glass NetworksLooking Glass Networks NYC NodeNew Yorkpeeringdb.com/fac/246
Lumen Technologies IncLevel(3) Jersey CityJersey Citypeeringdb.com/fac/739
Lumen Technologies IncLevel(3) New YorkNew Yorkpeeringdb.com/fac/348
Lumen Technologies IncLevel(3) NewarkNewarkpeeringdb.com/fac/1601
Lumen Technologies IncLevel(3) WeehawkenWeehawkenpeeringdb.com/fac/209
Lumen Technologies IncLumen New HavenNew Havenpeeringdb.com/fac/13693
Lumen Technologies IncLumen New YorkNew Yorkpeeringdb.com/fac/7267
Lumen Technologies IncLumen StamfordStamfordpeeringdb.com/fac/13695
Lumen Technologies IncLumen West HavenWest Havenpeeringdb.com/fac/13692
Metanet Communications, Inc.Metanet New York Data Center 60 HUDSONNew Yorkpeeringdb.com/fac/16291
Metanet Communications, Inc.Metanet New York Data Center CHELSEANew Yorkpeeringdb.com/fac/15240
Metanet Communications, Inc.Metanet New York Data Center GOOGLEPLEXNew Yorkpeeringdb.com/fac/15242
Metanet Communications, Inc.Metanet New York Data Center Staten IslandStaten Islandpeeringdb.com/fac/15241
MINDSHIFT TECHNOLOGIESmindSHIFT CommackCommackpeeringdb.com/fac/8781
New York InternetNYI NY1 (100 William Street)New Yorkpeeringdb.com/fac/1769
New York InternetNYI NY2 (60 Hudson Street)New Yorkpeeringdb.com/fac/6084
Omega Systems Consultants, LLCOmega CT1Stamfordpeeringdb.com/fac/16941
Planet Networks, Inc.Planet Networks Newton DatacenterNewtonpeeringdb.com/fac/7288
QTD SystemsQTD - 60 HudsonNew Yorkpeeringdb.com/fac/540
QTD SystemsQTD1 - 60 Hudson Street 1510New Yorkpeeringdb.com/fac/16615
QTD SystemsQTD2 - 60 Hudson Street 1602New Yorkpeeringdb.com/fac/16614
QTD SystemsQTD3 - 60 Hudson Street 1901New Yorkpeeringdb.com/fac/16617
QTS Realty Trust, Inc.QTS Jersey City (JCY1)Jersey Citypeeringdb.com/fac/579
QTS Realty Trust, Inc.QTS Piscataway (PNJ1)Piscatawaypeeringdb.com/fac/1177
Sabey Data Centers375 Pearl, Intergate.ManhattanNew Yorkpeeringdb.com/fac/1690
Sungard Availability ServicesSungard AS Carlstadt 777Carlstadtpeeringdb.com/fac/10866
Telehouse - Global Data CentersTelehouse - New York ChelseaNew Yorkpeeringdb.com/fac/1272
Telehouse - Global Data CentersTelehouse - Teleport Center (New York)Staten Islandpeeringdb.com/fac/737
TierPoint, LLCTierPoint Hawthorne (fka Xand)Hawthornepeeringdb.com/fac/2096
Tishman Real Estate Services165 Halsey Meet-Me RoomNewarkpeeringdb.com/fac/350
VPLSEvocative EWR1Secaucuspeeringdb.com/fac/2981
VPLSEvocative New York (JFK2)Chappaquapeeringdb.com/fac/3930
Webair501 Franklin AveGarden Citypeeringdb.com/fac/1040
WhiteLabel IT Solutions CorpWhiteLabelITSolutionsHackensackpeeringdb.com/fac/3876
WNET Global NetworkWnet Telecom USANew Yorkpeeringdb.com/fac/6598

Sites filing to add data center capacity, by quarter

The same record sets and search terms are read back to Q1 2025, so each bar counts the same way. The New Jersey state permits carry an issue date but no filing date, so they sit in no quarter.

3
Q1 25
1
Q2 25
2
Q3 25
0
Q4 25
3
Q1 26
2
Q2 26
0
Q3 26
A site counts once in a quarter however many permits it files. New York City building filings, New Jersey state permits on known data center parcels, and council, town board, planning and state notice records in the places we cover. Each quarter is read from the same record sets. NJSEA applications are listed separately. Comprehensive New Jersey municipal building permits remain outside the record.

The records

Every project in the record, Q1 2025 to Q3 2026

One row per job or legislative item, however many records sit behind it, with the quarter its permit was first issued. Declared value is the figure the filer gave the city. It is not a price for space, and the rows are never added together.

QuarterFirst filedPermit first issuedWhereThe workTypeDeclared valuePublic records
Q1 2025January 8, 2025None on recordTown of Orangetown, NY: no site address in the recordData Center Orangeburg Arch and ElevationsPlanning caseNot statedjanuary-8-2025-planning-board|Data Center Orangeburg Arch and Elevations
Q1 2025January 8, 2025None on recordTown of Orangetown, NY: no site address in the recordData Center Orangeburg Site Development PlansPlanning caseNot statedjanuary-8-2025-planning-board|Data Center Orangeburg Site Development Plans
Q1 2025February 10, 2025Q1 2025
March 10, 2025
New York City: 65 COURT STREET, Brooklyn, NY 11201Remove Existing Par Walls And Raised Floor In The Data Center. Modify Door And Raise Floo...OtherNot statedB01143895-I1
Q1 2025February 18, 2025Q1 2025
March 10, 2025
New York City: 65 COURT STREET, Brooklyn, NY 11201Remove all existing ductwork associated with 13th floor old data center non-functioning A...Office and supportNot statedB01143895-S1
Q1 2025February 27, 2025Q2 2026
May 11, 2026
New York City: 160 CONVENT AVENUE, Manhattan, NY 10031Proposed architectural renovations for the CUNY NAC Data Center on the 1st and 6th floors...OtherNot statedM00990578-I1
Q1 2025February 27, 2025Q2 2026
May 29, 2026
New York City: 160 CONVENT AVENUE, Manhattan, NY 10031Cuny City College Nac Data Center -Plumbing Work Proposed Filed In Conjunction To Hvac Up...Mechanical and coolingNot statedM00990578-S2
Q1 2025February 27, 2025Q2 2026
June 5, 2026
New York City: 160 CONVENT AVENUE, Manhattan, NY 10031Cuny/City College Nac Data Center -Sprinkler Work Proposed Filed In Conjunction To HVAC U...Fire and life safetyNot statedM00990578-S3
Q1 2025March 27, 2025Q2 2026
May 7, 2026
New York City: 60 HUDSON STREET, Manhattan, NY 10013Filed to install new emergency generator.Electrical and power$750,000M01193408-I1
Q1 2025March 31, 2025Q2 2025
April 2, 2025
New York City: 450 LEXINGTON AVENUE, Manhattan, NY 10017Replacement of air conditioning units for 34th floor Data Center. No change in use egress...Replacement, repair or routine workNot statedM01196880-I1
Q2 2025May 14, 2025None on recordNew York State environmental notice: 75 THIRD AVE, ORANGEBURG, NY 10962The Department has prepared a draft permit and has made a tentative determination to issu...Electrical and powerNot stated2025-05-14/completed-application/town-of-orangetown-orangetown-data-center
Q3 2025July 9, 2025None on recordTown of Orangetown, NY: no site address in the recordDatabank Orangeburg Phase Two 73.15-1-19 – Site PlansPlanning caseNot statedjuly-9-2025-project-review-committee|Databank Orangeburg Phase Two 73.15-1-19 – Plans, july-9-2025-project-review-committee|Databank Orangeburg Phase Two 73.15-1-19 – Site Plans, july-23-2025-planning-board|Databank Orangeburg Phase Two 73.15-1-19 – Site Plans
Q3 2025July 9, 2025Q3 2026
August 12, 2026
New York City: 60 HUDSON STREET, Manhattan, NY 10013Structural work as shown on plans filed herewith. Steel framing support of new mechanical...Electrical and power$175,000M01193243-S1
Q3 2025July 18, 2025Q4 2025
December 10, 2025
New York City: 198 EAST 161 STREET, Bronx, NY 10451Installation of fan coil units on flrs 3 - 10. Installation of in-row cooling system and...Site and utility workNot statedX01154964-I1
Q3 2025July 18, 2025Q4 2025
October 21, 2025
New York City: 198 EAST 161 STREET, Bronx, NY 10451New dunnage framing for mechanical equipment on 2nd floor roof. New steel supports for 4t...Mechanical and coolingNot statedX01154964-S1
Q3 2025July 18, 2025Q4 2025
November 12, 2025
New York City: 198 EAST 161 STREET, Bronx, NY 10451Relocating sprinkler heads to match new architectural layout at 4th floor data centerFire and life safetyNot statedX01154964-S3
Q3 2025July 24, 2025Q3 2025
September 19, 2025
New York City: 1 CENTRE STREET, Manhattan, NY 10007Remove and install new chilled water lines from central mechanical room (chiller room) to...Replacement, repair or routine workNot statedM01251230-I1
Q3 2025September 19, 2025Q3 2025
September 26, 2025
New York City: 1 CENTRE STREET, Manhattan, NY 10007Remove And Install Interior Paritions, Doors And Ceilings At 12 Floor Data Center. No Cha...Replacement, repair or routine workNot statedM01278410-I1
Q4 2025October 1, 2025Q1 2026
March 26, 2026
New York City: 1470 MADISON AVENUE, Manhattan, NY 10029Mount Sinai - Hess Data Center Chilled Water Expansion Project Phase 2 - Mechanical modif...Mechanical and coolingNot statedM01252416-I1, M01252416-S2
Q4 2025October 1, 2025Q2 2026
May 20, 2026
New York City: 1470 MADISON AVENUE, Manhattan, NY 10029Mount Sinai - Hess Data Center Chilled Water Expansion Project Phase 2 - Plumbing modific...OtherNot statedM01252416-S1
Q4 2025December 8, 2025Q4 2025
December 16, 2025
New York City: 111 EIGHTH AVENUE, Manhattan, NY 10011Replacement Of Existing Hvac Units (5 Crac Units). No Change In Use, Egress, Or Occupancy.Replacement, repair or routine work$429,990M01309002-I1
Q4 2025December 19, 2025Q4 2025
December 24, 2025
New York City: 32 AVENUE OF AMERICAS, Manhattan, NY 10013Filing for the Removal of Existing Crac Units on the 11th floor and remove and modify exi...Replacement, repair or routine work$243,979M01334527-I1
Q4 2025December 19, 2025Q4 2025
December 24, 2025
New York City: 32 AVENUE OF AMERICAS, Manhattan, NY 10013Filing to replace (5) CRAC Units and related pipingReplacement, repair or routine work$260,000M01334528-I1
Q1 2026January 7, 2026None on recordTown of Orangetown, NY: no site address in the record73.15-1-19 Databank Orangeburg Phase Two – Site ExhibitsPlanning caseNot statedjanuary-7-2026-project-review-committee|73.15-1-19
Q1 2026January 23, 2026Q1 2026
February 6, 2026
New York City: 2 METROTECH CENTER, Brooklyn, NY 11201Installation of reinforcing steel to support additional weight of data center racking and...Data hall fit-outNot statedB01343773-I1
Q1 2026January 28, 2026Q1 2026
January 28, 2026
New York City: 32 AVENUE OF THE AMERICAS, Manhattan, NY 10013Air conditioning unit replacement on the 7th floor Data Center. No change in use egress a...Replacement, repair or routine workNot statedM01310727-I1
Q1 2026March 10, 2026None on recordNew York City: 111 EIGHTH AVENUE, Manhattan, NY 10011Four (4) CRAC units are being replaced and one (1) new CRAC unit is being installed on th...Replacement, repair or routine work$714,600M01333337-I1
Q1 2026March 11, 2026None on recordTown of Orangetown, NY: no site address in the record73.15-1-19 Databank Orangeburg Phase Two – Landbanked Parking Exhibit, 73.15-1-19 Databan...Planning caseNot statedmarch-11-2026-project-review-committee|73.15-1-19, march-25-2026-planning-board|73.15-1-19
Q1 2026March 30, 2026None on recordNew York City: 233 CONOVER STREET, Brooklyn, NY 11231Proposed new building for Data Center Hub.New buildingNot statedB01128862-I1
Q2 2026April 2, 2026None on recordNew York City: 160 CONVENT AVENUE, Manhattan, NY 10031Cuny City College Nac Data Center -Plumbing Work Proposed Filed In Conjunction To Hvac Up...Mechanical and coolingNot statedM00990578-P3
Q2 2026April 2, 2026None on recordNew York City: 160 CONVENT AVENUE, Manhattan, NY 10031Cuny/City College Nac Data Center -Sprinkler Work Proposed Filed In Conjunction To HVAC U...Fire and life safetyNot statedM00990578-P4
Q2 2026April 2, 2026None on recordNew York City: 160 CONVENT AVENUE, Manhattan, NY 10031Proposed architectural renovations for the CUNY NAC Data Center on the 1st and 6th floors...OtherNot statedM00990578-P5
Q2 2026April 22, 2026Q3 2026
August 13, 2026
New York City: 32 AVENUE OF THE AMERICAS, Manhattan, NY 10013Modification to existing Mechanical systems as per plans filed herewith, Replacement of f...Replacement, repair or routine work$2.5 millionM01373807-I1
Q2 2026May 13, 2026None on recordTown of Orangetown, NY: no site address in the record73.15-1-19 Databank – Landbanked Parking Exhibit, 73.15-1-19 Databank Site Development Pl...Planning caseNot statedmay-13-2026-project-review-committee|73.15-1-19
Q2 2026May 27, 2026None on recordTown of Orangetown, NY: no site address in the record73.15-1-19 DataBank Orangeburg Phase Two – Landbanked Parking ExhibitPlanning caseNot statedmay-27-2026-planning-board|73.15-1-19
Q2 2026June 23, 2026Q2 2026
June 24, 2026
New York City: 375 PEARL STREET, Manhattan, NY 10038Modify Existing Data Center Layout With New Interior Metal Mesh Cage Partitions & Doors F...Data hall fit-outNot statedM01415768-I1
Q3 2026July 14, 2026None on recordTown of Islip, NY: no site address in the recordAuthorization for the Town Clerk to advertise for a public hearing to consider enacting a...Legislation and moratoriaNot stated1720
Q3 2026July 16, 2026None on recordTown of Brookhaven, NY: no site address in the recordIntroductory Local Law Number 11 of 2026 to Add Chapter 17 of the Town Code of the Town o...Legislation and moratoriaNot statedevent-4070, event-4072
Q3 2026July 22, 2026None on recordNew York State environmental notice: 2000 Corporate Dr in the Town of Orangetown, New YorkThe Town of Orangetown Planning Board, as lead agency, has made the Draft Scope for the p...Existing planning case updateNot stated2026-07-22/seqr/town-of-orangetown-databank-phase-ii, 2026-09-02/seqr/town-of-orangetown-databank-orangeburg-phase-two
Q3 2026July 24, 2026None on recordTown of Orangetown, NY: no site address in the recordEstablishing a Temporary Moratorium on Data Centers and Battery Energy Storage SystemsLegislation and moratoriaNot statedpost-47078
Q3 2026August 11, 2026None on recordTown of Islip, NY: no site address in the recordTo consider adopting Local Law No. 5 of 2026, Islip Town Code Chapter 68-761, entitled "M...Legislation and moratoriaNot stated1736
Q3 2026August 12, 2026None on recordTown of Orangetown, NY: no site address in the record73.15-1-19 Databank Orangeburg Phase 2 – Applicant Draft EIS Scoping Document 2026-07-24...Existing planning case updateNot statedaugust-12-2026-project-review-committee|73.15-1-19, august-26-2026-planning-board|73.15-1-19, september-9-2026-planning-board|73.15-1-19
Q3 2026August 26, 2026Q3 2026
August 31, 2026
New York City: 325 HUDSON STREET, Manhattan, NY 10013Filing herewith for two 30-ton energy recovery chillers and repurpose 170-ton Dry CoolerMechanical and cooling$314,200M01436429-I1
Q3 2026August 27, 2026None on recordTown of Orangetown, NY: no site address in the recordDatabank’s Positive Declaration DocumentsExisting planning case updateNot statedpost-47466
Q3 2026August 28, 2026None on recordTown of Orangetown, NY: no site address in the recordLOCAL LAW 5, 2026- TEMPORARY TOWN-WIDE MORATORIUM – BATTERY ENERGY STORAGE SYSTEMS AND DA...Legislation and moratoriaNot statedpost-47473
Q3 2026August 31, 2026None on recordTown of Trumbull, CT: no site address in the recordRESOLUTION TC31-65: To consider and act upon a resolution which would amend the Trumbull...Legislation and moratoriaNot statedAgenda/_08312026-6198, Agenda/_09092026-6197
Q3 2026August 31, 2026None on recordTown of Trumbull, CT: no site address in the recordIsaac, seconded by Mallozzi BE IT RESOLVED AND ORDAINED That the Trumbull Municipal Code...Legislation and moratoriaNot statedMinutes/_08312026-6198
Q3 2026September 1, 2026None on recordTown of Wallingford, CT: no site address in the recordWe need to update the ordinance before any data centers are built.Legislation and moratoriaNot stated12153
Q3 2026September 2, 2026None on recordNewark: no site address in the recordData Centers Moratorium: AN ORDINANCE AMENDING TITLE 41, ZONING AND LAND USE REGULATIONS...Legislation and moratoriaNot stated26-1273
Q3 2026September 3, 2026Q3 2026
September 9, 2026
Newark: no site address in the recordResolution of Support for a temporary moratorium of twelve (12) months on the development...Legislation and moratoriaNot stated26-1288
Q3 2026September 16, 2026None on recordNew York City: 60 HUDSON STREET, Manhattan, NY 10013Replacement Of The Fuel Oil Fill Spill Containers, Fuel Oil Fill Piping And Vent Piping....Replacement, repair or routine work$100,000M01428117-I1, M01428117-S1
Q3 2026September 23, 2026None on recordTown of Orangetown, NY: no site address in the record2026-09-22_DEIS Scoping Document_Data Center Phase 2Existing planning case updateNot statedseptember-23-2026-planning-board|2026-09-22_DEIS Scoping Document_Data Center Phase 2
Q3 2026September 23, 2026None on recordTown of Orangetown, NY: no site address in the record2026-09-23_Adopted DEIS Scoping Document_Data Center Phase 2Existing planning case updateNot statedseptember-23-2026-planning-board|2026-09-23_Adopted DEIS Scoping Document_Data Center Phase 2

New Jersey air permits for data centers

A data center needs a state air permit to run its backup generators, so this record often shows work before a building permit does. Each row is one decision by the state, since January 2024.

DateFacility, as the state names itWhat happenedPermit
September 4, 2026Iron MountainApprovedGEN260001
March 26, 2026EquinixApprovedPCP240002
February 27, 2026Equinix LlcApprovedPCP240002
October 23, 2025CoreweaveApprovedPCP250001
September 12, 2025205 Minnisink Road Data CenterApprovedGEN250001
July 24, 2025Cologix Nnj3ApprovedPCP240001
March 4, 2025Cyrus-One Nj LlcApprovedGEN250001
February 6, 2025Bloomberg Piscataway Data CtrApprovedGEN250001
November 7, 2024QTS Investments Properties Princeton LlcApprovedPCP240001
October 19, 2024Centersquare Ewr3ApprovedGEN240001
September 10, 2024Centersquare Ewr2 CampusRenewedPCP240004
September 4, 2024201 Main Ave Data CenterApprovedGEN240001
September 3, 2024Centersquare Ewr2 CampusApprovedGEN240001
June 13, 2024EquinixApprovedPCP230002
June 6, 2024PNJ1ApprovedGEN240001
January 10, 2024Equinix LlcApprovedPCP230001
January 9, 2024Iron MountainRenewedPCP230001

New Jersey Department of Environmental Protection air permit activities at facilities the state names as a data center or a data center operator. One falls in Q3 2026. A generator permit rating is backup plant, not the capacity a customer can use, so no rating is shown as megawatts of space. Each link opens the state's own record of the permit activity. Pending applications carry no decision date and are not in this table.

Buildings certified as finished

None of these jurisdictions has recorded a certificate of occupancy at an address that carries a data center permit. A certificate marks a building or tenant space being finished, never capacity being available.

New York's statewide pause

On July 14, 2026, New York issued Executive Order 62. It pauses discretionary state environmental permits for data centers able to draw 50 MW or more, until the state finishes a generic environmental impact statement. Applications the state had already deemed complete are not caught by it. This comes from the order, not from the permit records above, and it is summarised by Davis Wright Tremaine and DLA Piper. The records above cannot show whether it changed what was filed.

The pause is now a campaign issue. Governor Kathy Hochul's reelection campaign is running a statewide TV ad through Election Day that presents the moratorium as a way to keep utility bills down, City & State reported on September 23. Her Republican opponent, Nassau County Executive Bruce Blakeman, called the moratorium "crazy" in July and argues New York has to compete for data centers, according to NY1. This is news coverage, not a permit record.

What it means for a buyer

  • Plant replacement is not new capacity. New chillers, coolers and fuel systems in a carrier hotel keep existing floors running. They do not show that space is coming free.
  • A permit is not available space. It records that work was filed or issued. Whether any capacity is uncommitted is a question only the operator can answer.
  • An air permit comes before generators run. A pending modification in Secaucus or Franklin Township shows an operator changing its backup plant. An environmental review like Orangeburg's comes before any building permit. It does not say how much IT load a customer could sign for.
  • Moratoria change what can be built next, not what already runs. The moratoria above stop new data center approvals in those towns for a period. They do not close buildings already operating there.

What to watch next

  • The outcomes in Islip and Trumbull. Both held public hearings on data center moratoria this quarter, and neither record yet shows a vote.
  • DataBank Orangeburg Phase II's draft environmental impact statement, the next step after the September 9 scoping session.
  • Whether Newark brings the moratorium ordinance back after the council's September 9 resolution of support.
  • State decisions on the four pending New Jersey air permit changes. Whether the NJSEA applications add power, once their plans are public.
  • The November 3 governor's election. The statewide pause is a central issue in the race, and the two candidates disagree on whether it should stand.
  • Wallingford. Its Ordinance Committee said on September 1 that the town needs to update its ordinance before any data centers are built.

Coverage and cutoff

This report reads the public files that are live around New York City today. It is not a full tri-state report. A place with no file below is missing from this edition, not quiet.

  • New York City building filings: all five boroughs, from the Department of Buildings job filings. A filing is included when its description says data center, or when it is at one of eight buildings already known to house data centers and describes the plant a data center runs on: chillers, coolers, fuel oil, generators or electrical equipment. Office, cafe, facade and scaffold work at those buildings is left out, because they are mostly offices.
  • New Jersey construction permits: DCA's statewide feed contains July and some August 2026 permit rows, but no September rows. The latest receipt by the state is August 7. A search of 28 previously identified data-center parcels returned no Q3 matches. The latest matched permit is June 26, not the latest permit in the statewide file. This is incomplete coverage and a reporting lag, not a quiet quarter. DCA publishes issue dates, blocks and lots, but no application dates or work descriptions.
  • New Jersey local application supplement: the NJSEA 2026 register supplies the three Q3 applications above. Secaucus's posted August and September zoning agendas and earlier project records were also reviewed. This adds local detail in the Meadowlands. It does not cover every New Jersey municipality or every building-permit decision.
  • Council, town board and planning records: Newark council legislation, Brookhaven and Islip town board agendas and minutes, Orangetown planning board and local law records, and Trumbull and Wallingford agendas and minutes. These are legislation and review records, not permits, and the date shown is the meeting or posting date.
  • State environmental notices: New York's Environmental Notice Bulletin, read for the New York counties around the city.
  • Hudson Valley segment: Orangeburg in Rockland County and the Towns of Poughkeepsie and East Fishkill in Dutchess County. Sources are the state environmental notices, the Dutchess County industrial development agency agenda, Planning Board agendas and meeting summaries, and news reports where linked. Other Hudson Valley towns are not covered.
  • New Jersey air permits: decisions by the state Department of Environmental Protection at facilities the state names as a data center or a data center operator.
  • Not covered: a comprehensive search of municipal building-permit systems in New Jersey towns, and building permits outside New York City and New Jersey's state reports. Also not covered: Westchester, Nassau and Orange County towns, where no data center record since 2024 was found, and Stamford, whose public site refuses automated access.

Sources and revisions

Every row links to the public record it came from: the city's job filing, the state's permit record, the town's agenda, minutes or notice, the state's environmental notice, or the state's air permit record. Brookhaven's August 13 vote is taken from the town's draft minutes and will be re-checked against the approved minutes. Counts are generated from those records. This edition's figures are frozen. A later correction is added below with its date and reason, and the original figure stays visible.

Colocation Scout is run by a wholesale and colocation consulting company. The permit data is public and every row links to its filing. How we publish these reports.

Revisions: none yet. Edition status: final.

Cite this report as: Colocation Scout, "New York tri-state data center permits, Q3 2026," colocationscout.com/reports/new-york-tristate-data-center-permits-q3-2026.html

Media inquiries

Cody Swift
Data Center Advisor at Colocation Scout
Powered by Bridgepointe Technologies
844-506-2299

Research at Colocation Scout

Colocation Scout tracks data center construction across U.S. markets from public records: building permits, planning cases and state air permits. Every figure in a report links to the filing it came from, so any reader can check it. How we publish these reports.

About Bridgepointe Technologies

Bridgepointe Technologies has been a technology advisory firm since 2002. It helps companies choose data center, connectivity and cloud providers. It has more than 400 strategists, consultants, engineers and support staff. It has completed more than 1,200 data center and cloud projects.

Market intelligence

Ask what the record means for your requirement.

The filings show where data center work around New York City is on file and where towns are pausing it. A scout finds out which of it is reachable at your size, on your date, at a price worth signing.